Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Award of Merit, Sports/Entertainment: Toscano Family Gel Forum
Industry News

Award of Merit, Sports/Entertainment: Toscano Family Gel Forum

Machinery AsiaBy Machinery AsiaNovember 12, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Toscano Family Ice Forum

Storrs, Conn.

Merit Award


Sent by: JCJ Architecture

Owner: University of Connecticut

Main design: JCJ Architecture

General contractor: Turner Construction Co.

Civil Engineer: Lang

Structural Engineer: Macchi Engineers

MEP Engineer: CMTA

Ice Systems Engineering: B32 Engineering Group




The 97,300-square-foot University of Connecticut men’s and women’s hockey arena includes an ice-level lounge with cafes and an upper-level club with seating, a bar and expansive views.

The structure also includes training facilities, equipment rooms, advanced locker rooms, a hydrotherapy area, strength and conditioning rooms, a discus shooting room, coaches’ offices and a press box. Revisions during construction included exterior metal panels.

Toscano Family Ice Forum

Photo courtesy of JCJ Architecture

The 2,600-seat arena is targeting LEED certification and meeting Connecticut’s High Performance Building Standards. It has electric ice coatings, ecological materials and water saving technologies. Mitigation of subsoil conditions consisting of loose peat and solid rock included real-time logging using construction management software as well as performance testing. This optimized the stabilization process, enabled data-driven decision making and omitted unnecessary piers based on ground conditions.

The complexities of the prefab seating bowl and concourse-to-deck slab installation sequence were solved with a custom stadium form manufactured in Oregon.

The $58.7 million project was completed in 30 months on budget and on schedule.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleWSP leaders are rosy about US labor after the election
Next Article The rate cut boosts optimism despite a slump in the construction backlog
Machinery Asia
  • Website

Related Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Inspector dead, four workers injured in Kansas interstate construction zone crash

Popular Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026

Inspector dead, four workers injured in Kansas interstate construction zone crash

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.