Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Best Project, Water/Environment: Nut Island Headworks Odor Control Improvements
Industry News

Best Project, Water/Environment: Nut Island Headworks Odor Control Improvements

Machinery AsiaBy Machinery AsiaNovember 13, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Improvements to odor control in Nut Island Headworks

Quincy, Mass.

BEST PROJECT


Sent by: Walsh Construction

Owner: Massachusetts Water Resources Authority

Main design company: Hazen and Sawyer

General contractor: Walsh Construction




This $61.6 million project improved facilities and systems that control hydrogen sulfide gases produced during waste decomposition processes. Aside from their unpleasant odor, these gases can be harmful in high concentrations, underscoring the critical need for optimized HVAC systems to provide fresh air to work areas to maintain plant-wide safety.

In addition to requiring a strict sequential construction process to maintain seamless treatment operations during demolition and construction, all equipment planned for replacement was located underground. Major items included four 55,000-cubic-foot-per-minute fans, installation of carbon-containing fiberglass tanks, custom air handling units, and three new oil boilers with two new 20,000-gallon diesel tanks. Most of the facility’s ductwork also required replacement due to long-term exposure to the highly corrosive gases. These challenges were compounded by pandemic-related supply chain delays that required frequent sequencing and schedule adjustments throughout the project.

Improvements to odor control in Nut Island Headworks

Photo courtesy of Walsh Construction

To gain access to the work area, the project team temporarily replaced the existing prefabricated deck planks with waterproof panels that could be removed and reinstalled each day. Radio communication and hand signals helped crane operators overcome extreme job site visibility limitations, allowing them to accurately maneuver large sections of materials and equipment in underground spaces.

Comprehensive daily work plans, contingency strategies, and extensive task hazard analyzes helped protect workers from hazards such as high gas concentrations, treatment process chemicals, and silica dust from pedestal demolition, bases and slabs. Complex operations in confined spaces, such as the installation of equipment in effluent channels and work inside new tanks, demanded impeccable execution with no margin for error.

Improvements to odor control in Nut Island Headworks

Photo courtesy of Walsh Construction

While most of the construction took place underground, the project team was aware of its effects on the surface. Because Nut Island is part of the Boston Harbor Islands State and National Park, visitors often take advantage of the well-maintained gardens and boardwalks that surround the treatment facility.

Improvements to odor control in Nut Island Headworks

Photo courtesy of Walsh Construction

Privacy fences kept most of the work out of sight, while the crane’s strategic location in a parking lot allowed the footpath to remain open throughout the work. The project team paid strict attention to restoring the disturbed landscape, using only native plantings and adhering to the existing aesthetic.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleMerit Award, Interior Improvement/Tenant: Seu Veralto
Next Article DPR improves workplace bathroom offerings
Machinery Asia
  • Website

Related Posts

Two Pressures, One Channel: Conservation Meets Geopolitics in Panama

June 24, 2026

State Audit Clouds Future of Proposed NC Outer Banks Bridge

June 24, 2026

Gilbane-Turner JV leases $2.1 million stadium to Buffalo Bills

June 24, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Two Pressures, One Channel: Conservation Meets Geopolitics in Panama

State Audit Clouds Future of Proposed NC Outer Banks Bridge

Gilbane-Turner JV leases $2.1 million stadium to Buffalo Bills

Grant Certainty emerges as new failure in talks on transport project

Popular Posts

Two Pressures, One Channel: Conservation Meets Geopolitics in Panama

June 24, 2026

State Audit Clouds Future of Proposed NC Outer Banks Bridge

June 24, 2026

Gilbane-Turner JV leases $2.1 million stadium to Buffalo Bills

June 24, 2026

Grant Certainty emerges as new failure in talks on transport project

June 24, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.