Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » McCarthy-Vaughn JV starts $5 million Dallas pediatric health campus
Industry News

McCarthy-Vaughn JV starts $5 million Dallas pediatric health campus

Machinery AsiaBy Machinery AsiaNovember 15, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

McCarthy Vaughn Partnership broke ground in October on a $5 billion pediatric health campus in Dallas that will replace the existing Children’s Health Complex, the hospital said in a statement.

The big project will be significantly expanded hospital, surgical and ambulatory capacity in order to meet the needs of the rapidly growing North Texas region, according to the Oct. 1 press release. With the pediatric population expected to double by 2050, there is an urgent demand for advanced pediatric health care in the area.

McCarthy Vaughn Partnership, a joint venture of McCarthy Building Cos., based in St. Houston-based Louis and Vaughn Construction is the lead builder and construction manager at risk for the project, Children’s Health spokeswoman Virginia Hock said in an email.

the team will build the new Children’s Health campus, which involves a construction of 4.7 million square meters with a new pediatric hospital as the centerpiece. The hospital includes two 12-story towers and one eight-story tower, along with the larger care site.

Post L Group based in Fort Worth, Texas is the main team partner, Hock said, and Dallas-based HKS and Chicago-based Perkins & Will are the leading architectural firms. Commercial contractor packages will be purchased over the next 15 months, according to Hock.

The project’s 552 beds will increase inpatient capacity at Children’s Health by 38%, and the hospital will have 15% more space in the emergency department and 22% more space in the operating room, in addition to ‘room for future expansion, according to a McCarthy press release. It includes facilities such as games rooms designed for different ages and interests, rehabilitation and therapy gyms for patients’ families, pharmacies, cafes and a dining room.

A new fetal care center will offer complex maternal and fetal health care, and will be accessible by a new bridge connecting the redeveloped campus and William P. Clements Jr. University Hospital. from UT Southwestern. The project will also create a center for academic research, training and the development of life-saving technologies.

Substantial completion is expected within the next six years, according to Hock.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleThe projects earn high marks from the judges
Next Article Best Project, Water/Environment: Great Lakes Water Supply Program
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.