Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Award of Merit, Residential/Hospitality: The Standard in Bloomington
Industry News

Award of Merit, Residential/Hospitality: The Standard in Bloomington

Machinery AsiaBy Machinery AsiaNovember 16, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The Standard in Bloomington

Bloomington, Ind.

Merit Award


Sent by: Reference properties

Owner: Reference properties

Principal Design Firm/Structural/MEP/Interior Design/Landscape Architect: Boarman Kross Vogel Group Inc.

General contractor: Reference construction

Civil Engineer: Smith Design Group


Subcontractors: RH Marlin Excavating LLC; Lithko Recruitment; Solomon Plumbing; Houston Electric; RT Moore Mechanical Contractors; Drywall Enterprises LLC



This off-campus student housing community, comprised of three separate buildings connected by cell bridges, is located a short distance from the Indiana University campus.

Totaling 700,000 square feet, the Standard has 1,064 beds in 439 units ranging from a mix of studios to five bedrooms, all with 9-foot ceilings. A 33,000-square-foot outdoor space includes a pool and spa, an outdoor jumbotron, grills and fire pits, while another 30,000-square-foot indoor package includes a sauna, gym, sports simulator, climbing wall, game room, studio. areas, dog park, indoor basketball court and pickleball courts.

Modifying the project into three individual buildings allowed the team to take advantage of the sloping terrain and reduce the mass of the project. Each building was treated as its own entity with its own superintendents and three teams of dedicated subcontractors.

When contaminated soil was discovered while excavating for the foundations of Buildings 1 and 2, the team overexcavated up to 10 feet and added additional caissons to support the foundations. Although the unexpected challenge added 72 days to the schedule and approximately $2 million in costs, the project delivered one day early and $13,000 under budget.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAward of Merit, Sports/Entertainment: Baird Center
Next Article Best Project/Residential/Hospitality: The Bell-45 Erie Plaza
Machinery Asia
  • Website

Related Posts

Construction views west | Engineering News-Register

July 25, 2026

The boom in data center construction brings a new focus to security

July 24, 2026

Construction views west | Engineering News-Register

July 24, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

How a light car trailer makes towing easier

Construction views west | Engineering News-Register

How much does a minicar cost? New vs Used Buyer’s Guide: Direct Minicarts

The boom in data center construction brings a new focus to security

Popular Posts

How a light car trailer makes towing easier

July 27, 2026

Construction views west | Engineering News-Register

July 25, 2026

How much does a minicar cost? New vs Used Buyer’s Guide: Direct Minicarts

July 25, 2026

The boom in data center construction brings a new focus to security

July 24, 2026
Heavy Machinery

How a light car trailer makes towing easier

July 27, 2026

Is a tilt deck trailer better than ramps?

July 17, 2026

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.