Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Tampa Bay Rays stadium roof repair could cost $55.7 million
Industry News

Tampa Bay Rays stadium roof repair could cost $55.7 million

Machinery AsiaBy Machinery AsiaNovember 19, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Dive Brief:

  • Repair of the Camp Tropicana roof in St. Petersburg, Fla., before the start of the 2026 season would cost $55.7 million, according to a city report obtained by AP News.
  • The roof of the home of MLB’s Tampa Bay Rays broke up with Hurricane Milton landed in the region on Oct. 9, ripping off 18 of the 24 fabric panels on top of the site, AP reported. The storm also damaged interior parts of the track.
  • The stadium is scheduled to be demolished once again A $1.3 billion stadium opens for the 2028 season. With the many costs that the city – which owns the stadium – and Pinellas County have incurred due to two hurricanes this fall, municipalities may reconsider plans or decide not to repair The Trop, he reported AP News.

Diving knowledge:

The venue’s roof was built to withstand winds of up to 115 mph, according to the team’s media guide.

A 412-page report released Nov. 12 by St. Petersburg-based Hennessy Construction Services found that the dome’s structure “does not appear to have been adversely affected,” according to AP News. According to the report, the main structure remains serviceable and capable of supporting a new fabric roof.

However, spending cash on the solution may not be high on your to-do list. The city’s insurance on the damage includes a $22 million deductible, so it would only cover a portion of the overall repair costs, according to AP News.

“We have a lot of needs across the city,” City Councilor Brandi Gabbard said at a meeting, according to AP News. “I love the Rays. I love Tropicana Field. It’s not about not wanting to do this. It’s about a balance of priorities.”

A construction crane actually collapsed in Milton’s strong winds, leaving a gaping hole in a downtown St. Petersburg office building that houses many businesses, including the Tampa Bay Times. Crews quickly removed the crane after the stormaccording to the Tampa Bay Business Journal.

As for the team’s future home, the US arm of Sweden-based Skanska announced that it would act as the owner’s representative in the $6.5 billion redevelopment of historic gas plant property in Saint Petersburg. The builder and developer will also act as the owner’s representative for the design and construction of the Rays’ new stadium as part of the development.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleState infrastructure ballot initiatives yield mixed results
Next Article Half of IIJA funds not spent with Trump set to take office
Machinery Asia
  • Website

Related Posts

Fluor Tapped for Initial Work on 480 MW Kentucky Data Center Campus

March 20, 2026

Fluor Tapped for Initial Work on 480 MW Kentucky Data Center Campus

March 20, 2026

Procore partners with NVIDIA on Data Center Digital Twins, Kewazo secures $35 million funding round

March 20, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Fluor Tapped for Initial Work on 480 MW Kentucky Data Center Campus

Fluor Tapped for Initial Work on 480 MW Kentucky Data Center Campus

Procore partners with NVIDIA on Data Center Digital Twins, Kewazo secures $35 million funding round

Homeland Security nominee Mullin faces tough questions as nomination moves forward

Popular Posts

Fluor Tapped for Initial Work on 480 MW Kentucky Data Center Campus

March 20, 2026

Fluor Tapped for Initial Work on 480 MW Kentucky Data Center Campus

March 20, 2026

Procore partners with NVIDIA on Data Center Digital Twins, Kewazo secures $35 million funding round

March 20, 2026

Homeland Security nominee Mullin faces tough questions as nomination moves forward

March 20, 2026
Heavy Machinery

Car trailer turn box guide for safe and efficient towing

March 20, 2026

How much weight can a flatbed car transporter trailer carry?

March 16, 2026

How to choose the right aluminum deck trailer for heavy vehicles

March 16, 2026

Which material makes the car trailer steel or aluminum more durable

March 12, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.