Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Award of Merit, Manufacturing — Chisholm 20 Commerce Park
Industry News

Award of Merit, Manufacturing — Chisholm 20 Commerce Park

Machinery AsiaBy Machinery AsiaNovember 27, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

PARC COMERÇ CHISHOLM 20

Benbrook, Texas

Merit Award


Sent by: Ridgemont Commercial Construction

OWNER Jackson Shaw

LEADING DESIGN COMPANY GSR | Andrade

GENERAL CONTRACTOR Ridgemont Commercial Construction

CIVIL/STRUCTURAL ENGINEERING/MEP Hunt & Joiner Inc.


SUBCONTRACTORS Kent Cos.; J&E Cos.; ESJ; Hill Country Structural Inc.; Top Flight Steel Inc.



Set on 69 hectares, this $61 million 917,374 sq m business park is home to four Class A buildings, with scope including the full development of all utilities, gas, water and roads on three separate sites.

Each building features 10 feet of glass at the entrance and standard 9 ¼ inch thick tilt wall panels. Crews also installed several retaining walls, as well as a retaining pond and a retaining pond with a spring.

This was also the first industrial building project for the city of Benbrook. Work began on this U-shaped site amid a concrete shortage, mitigated with the help of an on-site concrete batch plant. However, the team continued to monitor the volatility of available materials and additional costs that could affect the concrete tilt wall panel manufacturing schedule.

Building 3 has a fill of more than 35 feet vertically, retained by a stone gravity retaining wall of equal elevation. To achieve this, the team used excavated material from other construction sites, which helped avoid excessive trucking costs. All excavation backfill was monitored and tested for proper moisture, compaction and density to prevent future building movement.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Sports/Entertainment: Epicenter of Fort Bend County
Next Article Completed apartments increase by 61% year-on-year
Machinery Asia
  • Website

Related Posts

The GAO report finds a lengthy review process for hazard mitigation efforts in the US

October 1, 2026

Capture continuous job site data with autonomous drone services

October 1, 2026

From data to decisions: getting financial insights

October 1, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

3 Alternatives to the Harbor Freight Trailed Backhoe

The GAO report finds a lengthy review process for hazard mitigation efforts in the US

Capture continuous job site data with autonomous drone services

From data to decisions: getting financial insights

Popular Posts

3 Alternatives to the Harbor Freight Trailed Backhoe

October 1, 2026

The GAO report finds a lengthy review process for hazard mitigation efforts in the US

October 1, 2026

Capture continuous job site data with autonomous drone services

October 1, 2026

From data to decisions: getting financial insights

October 1, 2026
Heavy Machinery

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

2 Place Car Trailer: How To Choose The Right Two Car Transporter For Vehicle Transport?

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.