Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Award of Merit, Manufacturing — Chisholm 20 Commerce Park
Industry News

Award of Merit, Manufacturing — Chisholm 20 Commerce Park

Machinery AsiaBy Machinery AsiaNovember 27, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

PARC COMERÇ CHISHOLM 20

Benbrook, Texas

Merit Award


Sent by: Ridgemont Commercial Construction

OWNER Jackson Shaw

LEADING DESIGN COMPANY GSR | Andrade

GENERAL CONTRACTOR Ridgemont Commercial Construction

CIVIL/STRUCTURAL ENGINEERING/MEP Hunt & Joiner Inc.


SUBCONTRACTORS Kent Cos.; J&E Cos.; ESJ; Hill Country Structural Inc.; Top Flight Steel Inc.



Set on 69 hectares, this $61 million 917,374 sq m business park is home to four Class A buildings, with scope including the full development of all utilities, gas, water and roads on three separate sites.

Each building features 10 feet of glass at the entrance and standard 9 ¼ inch thick tilt wall panels. Crews also installed several retaining walls, as well as a retaining pond and a retaining pond with a spring.

This was also the first industrial building project for the city of Benbrook. Work began on this U-shaped site amid a concrete shortage, mitigated with the help of an on-site concrete batch plant. However, the team continued to monitor the volatility of available materials and additional costs that could affect the concrete tilt wall panel manufacturing schedule.

Building 3 has a fill of more than 35 feet vertically, retained by a stone gravity retaining wall of equal elevation. To achieve this, the team used excavated material from other construction sites, which helped avoid excessive trucking costs. All excavation backfill was monitored and tested for proper moisture, compaction and density to prevent future building movement.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Sports/Entertainment: Epicenter of Fort Bend County
Next Article Completed apartments increase by 61% year-on-year
Machinery Asia
  • Website

Related Posts

Two Pressures, One Channel: Conservation Meets Geopolitics in Panama

June 24, 2026

State Audit Clouds Future of Proposed NC Outer Banks Bridge

June 24, 2026

Gilbane-Turner JV leases $2.1 million stadium to Buffalo Bills

June 24, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Two Pressures, One Channel: Conservation Meets Geopolitics in Panama

State Audit Clouds Future of Proposed NC Outer Banks Bridge

Gilbane-Turner JV leases $2.1 million stadium to Buffalo Bills

Grant Certainty emerges as new failure in talks on transport project

Popular Posts

Two Pressures, One Channel: Conservation Meets Geopolitics in Panama

June 24, 2026

State Audit Clouds Future of Proposed NC Outer Banks Bridge

June 24, 2026

Gilbane-Turner JV leases $2.1 million stadium to Buffalo Bills

June 24, 2026

Grant Certainty emerges as new failure in talks on transport project

June 24, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.