Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Merit Award, Bridge/Tunnel: Anji Khad Bridge
Industry News

Merit Award, Bridge/Tunnel: Anji Khad Bridge

Machinery AsiaBy Machinery AsiaDecember 13, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Anji Khad Bridge

Jammu and Kashmir, India

Merit Award


Sent by: Italferr SpA

Owners: Konkan Railway Corp. Ltd.; Northern Railway

Leading design company | Structural Engineer: Mario Petrangeli & Associates

General contractor: Hindustan Construction Co.

Civil Engineer | Construction Supervisor: Italferr SpA




Spanning a length of 473.25 m including its approaches, India’s first cable-stayed bridge is a critical component of the ambitious 345 km long railway line planned by the government to link the Kashmir Valley with the India’s widest network of railways, strengthening connectivity and the economy. development in the region.

Because of the steep terrain, crews used prefabrication to weld pull cable support plates and attach anchor boxes with the safety of a workshop prior to construction. The suspended rigs supported the drilling rigs used for slope stabilization work to improve safety.

The bridge’s asymmetrical brace design was strategically chosen to facilitate most of the construction from one end. This approach was based on available space and slope stability at one end, while addressing constraints at the other end. For the 193 m high main pylon, the team used jump-shaped formwork, a first in the country.

To address the strong wind flows in the valley area, aerodynamic fins were designed on both sides of the deck. These fins effectively countered wind pressures, improving the stability and safety of the bridge. A tower crane with a capacity of 25 tons and an extended height of 205 m facilitated efficient lifting operations.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAustralian company Bechtel signs revised deal to build three-train US LNG project
Next Article Australian company Bechtel reviews deal to build three-train US LNG project
Machinery Asia
  • Website

Related Posts

State Audit Clouds Future of Proposed NC Outer Banks Bridge

June 24, 2026

Gilbane-Turner JV leases $2.1 million stadium to Buffalo Bills

June 24, 2026

Grant Certainty emerges as new failure in talks on transport project

June 24, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

State Audit Clouds Future of Proposed NC Outer Banks Bridge

Gilbane-Turner JV leases $2.1 million stadium to Buffalo Bills

Grant Certainty emerges as new failure in talks on transport project

Skillit teams up with DPR, Suffolk Technologies to hire

Popular Posts

State Audit Clouds Future of Proposed NC Outer Banks Bridge

June 24, 2026

Gilbane-Turner JV leases $2.1 million stadium to Buffalo Bills

June 24, 2026

Grant Certainty emerges as new failure in talks on transport project

June 24, 2026

Skillit teams up with DPR, Suffolk Technologies to hire

June 24, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.