Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Contractor Suffolk’s hospital project is on the critical list after the owner’s bankruptcy
Industry News

Contractor Suffolk’s hospital project is on the critical list after the owner’s bankruptcy

Machinery AsiaBy Machinery AsiaDecember 17, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Before suffering problems that now threaten to kill it, a new hospital built by Suffolk Construction in Norwood, Massachusetts, was shaping up to be a recovery story.

The existing hospital at the site had been forced to shut down most local operations since devastating rain and flooding in 2020.

Hospital president Salvatore Perla, who in April 2023 stood in front of a landscape of soil, concrete foundations and steel delivery trucks to videotape a cheerful progress report on the project building replacement, he acknowledged that everyone in Norwood is “super anxious about the schedule.”

But after Suffolk Construction and its subcontractors broke ground on the new building last January, another tragedy struck when the hospital’s owner, Dallas-based Steward Health Care, defaulted on the work and the He declared bankruptcy in May.

Medical Properties Trust, an Alabama-based real estate investment trust that owns hospital buildings leased by Steward, took over the hospital’s architecture and construction management contracts and began paying to keep the work going .

But after the Massachusetts Department of Health refused to extend the deadline for the new hospital operating license requested by the trust, it expired last month.

The project remains in legal limbo with the trust now suing the department in state court in Boston over the licensing issue. The trust is seeking an injunction to prevent the state from withholding the operating license, saying the decision was arbitrary and detrimental to its large investment in the project.

Suffolk Construction has a four-person crew completing winterization and conditioning, a spokesman says. “We’ll probably be out of a job in the next few months, April at the latest,” he says.

In its lawsuit against Massachusetts, the trust alleges that its property insurer had paid only $36 million of a $200 million claim. The dispute centers on the insurer’s claim, in a separate lawsuit in Boston, that the policy payout cannot exceed a sublimit of $100 million for flood damage, the trust says.

The court timetable to resolve the dispute remains uncertain, the board also says, noting that it “depends on these insurance payments to help cover the cost of construction and move the project forward.”

Steward initially estimated the cost of the new hospital building in 2021 at $325.7 million, but costs have increased, the trust alleges.

Another Steward construction project, the Wadley Regional Medical Campus in Texarkana, Texas, has fared better than its Boston-area counterpart.

Main contractor Robins & Morton halted project work at the new facility for several weeks earlier this year after Steward stopped paying. But the trust also took over that project, and in September, CHRISTUS Ark-La-Tex, another hospital chain, bought the medical facility and is operating it.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleThe main legal issues of 2024 | Immersion in construction
Next Article Trump promises to speed up permits for megaprojects
Machinery Asia
  • Website

Related Posts

With its first office-to-housing project complete, Chicago advances the ‘next chapter’ for its downtown

October 1, 2026

The new NCCER tool aims to train new hires, upskill vets

October 1, 2026

GAO report finds review process too long for risk mitigation projects in US

October 1, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

With its first office-to-housing project complete, Chicago advances the ‘next chapter’ for its downtown

The new NCCER tool aims to train new hires, upskill vets

GAO report finds review process too long for risk mitigation projects in US

3 Alternatives to the Harbor Freight Trailed Backhoe

Popular Posts

With its first office-to-housing project complete, Chicago advances the ‘next chapter’ for its downtown

October 1, 2026

The new NCCER tool aims to train new hires, upskill vets

October 1, 2026

GAO report finds review process too long for risk mitigation projects in US

October 1, 2026

3 Alternatives to the Harbor Freight Trailed Backhoe

October 1, 2026
Heavy Machinery

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

2 Place Car Trailer: How To Choose The Right Two Car Transporter For Vehicle Transport?

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.