Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home ยป Award of Merit – Aquatic Environment: Priest Rapids Right Embankment Improvements
Industry News

Award of Merit – Aquatic Environment: Priest Rapids Right Embankment Improvements

Machinery AsiaBy Machinery AsiaDecember 18, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

PRIEST RAPIDS RIGHT LAND IMPROVEMENTS

Mattawa, Wash.

Merit Award


Sent by: IMCO General Construction

OWNER: Grant County PUD no. 2

LEADING DESIGN COMPANY: Stantec

GENERAL CONTRACTOR: IMCO General Construction




Originally built in 1958, Priest Rapids Dam is a composite structure with a center channel spillway and powerhouse and left and right embankments. Through proactive hazard identification modeling, the client discovered that the right abutment embankment dam was susceptible to failure under seismic events. This $60.9 million project was intended to provide a backup dam should the existing levee dam fail, ensuring the safety of the neighboring Wanapum Indian Tribal Village located immediately downstream and protecting lands used for traditional cultural practices. To mitigate impacts to the village during construction, the entire project was also subject to strict work schedules.

The scope of work included a 55 feet high by 1,785 feet long roller compacted concrete (RCC) dam constructed downstream of the existing right embankment. Beyond the liquefiable zone, the RCC dam is reconnected to the existing embankment by a new 250-foot-long earthen embankment, further reinforced by a bentonite-infused plastic concrete shear wall drilled through the new embankments and existing The wall is 60 feet deep and 300 feet long and is composed of piles 10 feet in diameter with rock plinths 5 feet to 10 feet.

The contractor operated two batch plants of its own to produce concrete materials including RCC, conventional concrete and plastic concrete. At peak production, the plants manufactured more than 1,300 m3 of material per shift.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAward of Merit – Office/Retail/Mixed Use: Home of Thesis
Next Article Better Health Care: 8th Floor Renovation of PeaceHealth St. Medical Center
Machinery Asia
  • Website

Related Posts

US Justice Department Seeks Stay of June 16 Enbridge Line 5 Shutdown

February 5, 2026

EPA proposes rolling back Biden-era clean air Good Neighbors plan

February 5, 2026

To Streamline Construction, White House Introduces Permit Tools Pilot

February 4, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

US Justice Department Seeks Stay of June 16 Enbridge Line 5 Shutdown

EPA proposes rolling back Biden-era clean air Good Neighbors plan

To Streamline Construction, White House Introduces Permit Tools Pilot

Proposed ICE warehouse conversion in Merrimack, NH adds to early construction uncertainty

Popular Posts

US Justice Department Seeks Stay of June 16 Enbridge Line 5 Shutdown

February 5, 2026

EPA proposes rolling back Biden-era clean air Good Neighbors plan

February 5, 2026

To Streamline Construction, White House Introduces Permit Tools Pilot

February 4, 2026

Proposed ICE warehouse conversion in Merrimack, NH adds to early construction uncertainty

February 4, 2026
Heavy Machinery

Why car trailer weight is so important for safe towing

February 4, 2026

How to choose a smart car trailer

February 3, 2026

Galvanized tilting trailer for the transport of cars and equipment

February 3, 2026

Car hauler trailer kit basics for real world towing

January 26, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.