Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป BLS reports that construction work openings reached a low mark in December
Industry News

BLS reports that construction work openings reached a low mark in December

Machinery AsiaBy Machinery AsiaFebruary 4, 2025No Comments1 Min Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Construction hiring numbers in December reached their lowest levels since April 2020, according to the recent published Statistics Office of the Labor Statistics Office and the Labor Billing Survey. (Jolts). The number of open positions at the end of December was estimated at 217,000, a decrease of 55,000 jobs from November 2024. In comparison, the number of open positions in December marks a 50% fall of 434,000 jobs. Available in December 2023.

“Despite these signs of weak demand for work, both layoffs and abandonments are still extremely low according to historical standards,” said Anirban Basu, associated builders and contractors (ABC) in a statement. “The weak demand for construction labor may be the effect of the cold climate and the slowdown of activity during the transition between the presidential administrations.”

However, BASU does not expect this trend to continue. According to the ABC trust index, construction companies plan to add staff next year, “suggesting that hiring could be collected in the first half of 2025,” he says.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleConstruction expenditure is reduced as the costs are increased ahead of rates
Next Article It is not just the incursions in the workplace. I-9 electronics manipulated could be a threat of expensive immigration for entrepreneurs under Trump.
Machinery Asia
  • Website

Related Posts

Meta commits to $115 million in construction labor pipeline for AI data centers

June 10, 2026

Construction views to the east | Engineering News-Register

June 9, 2026

Federal judge blocks Trump’s $100,000 fee for new H-1B visas

June 9, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Meta commits to $115 million in construction labor pipeline for AI data centers

Construction views to the east | Engineering News-Register

Federal judge blocks Trump’s $100,000 fee for new H-1B visas

Penn Station renderings reveal design for $8 million reconstruction beneath Madison Square Garden

Popular Posts

Meta commits to $115 million in construction labor pipeline for AI data centers

June 10, 2026

Construction views to the east | Engineering News-Register

June 9, 2026

Federal judge blocks Trump’s $100,000 fee for new H-1B visas

June 9, 2026

Penn Station renderings reveal design for $8 million reconstruction beneath Madison Square Garden

June 9, 2026
Heavy Machinery

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

As a double-axle tilting trailer facilitates the transport of vehicles and equipment

June 5, 2026

TYPHON Machinery Launches New xFlex Scissor Lift Series Designed for Safer and Smarter Modern Worksites

June 1, 2026

What are the most durable materials used in the construction of car trailers

May 13, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.