Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Modjeski and Masters Designs Rainbow Bridge replacement to Boise
Industry News

Modjeski and Masters Designs Rainbow Bridge replacement to Boise

Machinery AsiaBy Machinery AsiaFebruary 25, 2025No Comments1 Min Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Modjeski and Masters support the Department of Transport Idaho as the main consultant for a new bridge on the northern fork of the Payette River in Valley County, Idaho.

In addition to designing the bridge, the team will also help determine the future of the existing Sant Martí Arc Bridge, which currently transports thousands of vehicles daily. Built in 1933, it was the final link of the new state road 55 between Boise and McCall and appears in the National Register of Historical Places.

The bridge will be built on a new alignment adjoining the existing bridge, with projects partners that also include Kimley-Horn, RBCI, NV5, Russo Structures and Environmental Anderson.

The project will be a challenge given its location in a narrow cannon that has a significant inclination. The team’s most critical considerations include access to the contractor, minimizing mountain cuts, construction and programming, given seasonal traffic patterns. The preliminary design part of the project is underway, with the construction scheduled for 2028 to 2029.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleViews of Eastern construction | Engineering-Record News
Next Article Apple will invest more than $ 500 million in US manufacture
Machinery Asia
  • Website

Related Posts

Design review platform Buildcheck raises $12 million, DPR/WND among backers

October 2, 2026

Hudson, NH Completing repairs to Veterans Memorial Bridge girder cracks

October 1, 2026

The future of construction AI will be built on jobsites

October 1, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Design review platform Buildcheck raises $12 million, DPR/WND among backers

Expand your LEGO cityscape with this yellow backhoe set discounted for the first time down to $24

Hudson, NH Completing repairs to Veterans Memorial Bridge girder cracks

The future of construction AI will be built on jobsites

Popular Posts

Design review platform Buildcheck raises $12 million, DPR/WND among backers

October 2, 2026

Expand your LEGO cityscape with this yellow backhoe set discounted for the first time down to $24

October 2, 2026

Hudson, NH Completing repairs to Veterans Memorial Bridge girder cracks

October 1, 2026

The future of construction AI will be built on jobsites

October 1, 2026
Heavy Machinery

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

2 Place Car Trailer: How To Choose The Right Two Car Transporter For Vehicle Transport?

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.