Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home » Best Office/Detail/Mixed Use: The Airie On-Mountain Restaurant
Industry News

Best Office/Detail/Mixed Use: The Airie On-Mountain Restaurant

Machinery AsiaBy Machinery AsiaMarch 15, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The Aerie On-Mountain restaurant

Copper Mountain, Colo.

Office/Detail/Mixed Use

Region: Mountain Statles



Sent by: Hyder construction

Owner: Copper mountain

Lead design company: Bull Stockwell Allen

General contractor: Hyder construction

Civil Engineer: Tetra tech

Structural Engineer: Walter P Moore

MEP Engineer: BG Buildingworks




The construction of the 25,000 -square -meter aerie restaurant on the top of the Colorado copper mountain required an unconventional approach to the construction of 11,207 feet. The site is designed to be open throughout the year for consistent income for the complex and the installation is attached to the American Eagle Gondola, which results on its second floor.

The ski resort had stopped the project during the pandemic, and the work was only 10% complete when Hyder Construction took over the leadership of the two-story lodge of $ 26 million in 2022. The project executive, Doug Thompson, says that the contractor made the hard call to work through the ski season to achieve it as quickly as possible.

The Aerie On-Mountain restaurant

Image courtesy Brandon Huttenlocher and Copper Mountain

“The hardest thing is to always put the crews on the site, but the gondola made it feasible due to its proximity,” he says.

The Aerie On-Mountain restaurant

Image courtesy Brandon Huttenlocher and Copper Mountain

Incorporated innovative techniques and design elements that involved a myriad of environmental considerations. Work near the gondola required careful coordination and activities were strictly controlled. The design of the building included parameters to avoid conflicts with the operation of Gondola and Hyder worked with the lift operator to ensure everyone’s safety. Snowcat tools and equipment was allowed once a day, and Thompson says he had a high level of planning to find out what was absolutely necessary for every trip on the mountain. Snowcats could only transport the deposits of 5 gardens, so that minimizing construction waste was essential. A full -time employee inspected and resorted to each load to prevent excess material.

The Aerie On-Mountain restaurant

The Aerie is designed to improve the multipurpose capacities of Copper Mountain and includes a formal dining room, a bar and a living room.
Image courtesy Brandon Huttenlocher and Copper Mountain

The aerie kitchen team includes a biodigester to turn organic waste into gray waters instead of sending it to landfills. The first of its type in Colorado, the system is designed to function efficiently at high elevation, allowing staff to attend more people in a smaller space and establish a new standard for mountain facilities. The project was delivered to the programming and the budget in October 2023.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Health Care: Mayo Az Bold Forward Expansion Clinic
Next Article The spill of raw wastewater makes the waters between San Diego and Tijuana, Mexico
Machinery Asia
  • Website

Related Posts

Merit Award, Specialized Construction: GeoBarrier System at the Furama Riverfront Hotel

December 14, 2025

Best Project, Government Building: New Consulate General of the United States in Merida | The project team overcomes the unexpected

December 14, 2025

Best Project, Sports/Show: Santiago Bernabéu Stadium

December 14, 2025
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Merit Award, Specialized Construction: GeoBarrier System at the Furama Riverfront Hotel

Best Project, Government Building: New Consulate General of the United States in Merida | The project team overcomes the unexpected

Best Project, Sports/Show: Santiago Bernabéu Stadium

Merit Award, Power/Industrial: Combined Cycle Implementation at the Santa Cruz Thermoelectric Power Plant

Popular Posts

Merit Award, Specialized Construction: GeoBarrier System at the Furama Riverfront Hotel

December 14, 2025

Best Project, Government Building: New Consulate General of the United States in Merida | The project team overcomes the unexpected

December 14, 2025

Best Project, Sports/Show: Santiago Bernabéu Stadium

December 14, 2025

Merit Award, Power/Industrial: Combined Cycle Implementation at the Santa Cruz Thermoelectric Power Plant

December 13, 2025
Heavy Machinery

Aluminum car trailer

December 2, 2025

Wheel Dozer vs. Crawler Dozer

November 20, 2025

Where can I find reliable mini excavator dealers near me?

October 27, 2025

The complete expert guide to faster and smarter cargo transportation

October 27, 2025

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.