Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Moss Construction closes 182 million dollars renewal of the football arena
Industry News

Moss Construction closes 182 million dollars renewal of the football arena

Machinery AsiaBy Machinery AsiaApril 1, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Do us know if you have comments.

Prize: Award Renewal of the stadium
Value: 182 million dollars
Location: Frisco, texas
Customer: FC Dallas

Fort Lauderdale, Moss Construction, based in Florida has won a $ 182 million contract From FC Dallas to carry out renovation work at the Toyota Stadium in Frisco, Texas.

Work on the east side of the Major League football stadium is currently underway, according to a statement shared with Construction Dive. Moss and FC Dallas Construction hosted a joint innovative on March 26.

The aspects of the renewal include:

  • Three new clubs.
  • Renewed tickets to the north, to the east and west.
  • A “Architecturally Distinctive Roof structure” designed to provide shadow to customers of the stadium.
  • Expanded seat capacity (the enclosure currently has 20,500 seats).
  • New levels of suite.
  • Increased concessions and locations of the toilet.
  • The largest video board in a specific MLS football venue.

FC Dallas will continue to host MLS parties at Toyota Stadium during the renewal process.

“This is not your typical reform. We are building the new Toyota stadium while games are still played without compromising the fans’ experience,” said Moss Construction Senior Vice President Jim Cuddihee in the statement.

The east side will be reopened in summer 2026, according to the launch, as the work moves to the west side, with the complete renewal planned for the end of the first quarter of 2028.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleUpdating the toilet holes closes the NJ Intersate-80 key, as officials are looking for solutions, funding
Next Article ABC expects Trump Chips Act to change open doors to open store contractors
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.