Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Equinor stopped $ 5 million Empire Wind Construction after Feds Additional Review
Industry News

Equinor stopped $ 5 million Empire Wind Construction after Feds Additional Review

Machinery AsiaBy Machinery AsiaApril 17, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The Norwegian developer Energy Equinor says he has suspended the construction of his $ 5 million $ 5 million energy project in New York in response to a Trump administration warning that he directed to stop the work waiting for a new review.

Empire Wind, which was allowed last year, plans to have 54 turbines in a place of 80,000 hectares located 15-30 miles southeast of Long Island. With a capacity of 810 MW, it would feed up to 500,000 homes through underwater cables that connect to a substation to Sunset Park, Brooklyn.

Equinor says the value of the project’s raw book reached about $ 2.5 billion to March 31.

Although administration officials have indicated that they expect to accelerate many projects by reducing regulatory reviews and the speed of permits, United States Interior Secretary Doug Burgum wrote on social networks that the review is necessary due to “information that suggests that the Biden administration was rushed through their approval without sufficient analysis”. President Donald Trump, who stated the opponent’s rhetoric of Offshore Wind, issued an executive order in January by directing an additional review of approved projects.

The decision to stop the work was from the Department of the Interior in consultation with the Secretary of Commerce Howard Lutnick, added Burgum.

The construction by Skanska began at the South Brooklyn Marine Terminal in June 2024 after Empire received all the necessary state and federal permits. Off -sea work was scheduled to begin this year. The wind farm was expected to begin to deliver energy by the end of 2026 and would be completely operational in 2027.

Equinor said in a statement that he complies with the order, but he is also “related to the relevant authorities to clarify this topic and are studying legal remedies, including appealing the order”. New York Governor Kathy Hochul criticized the stop order, calling it “federal overcoming” in a statement.

“I will fight in all steps of the way to protect the union jobs, the affordable energy and the economic future of New York,” said Hochul.

Equinor finished his lease for Empire Wind in 2017 during the first Trump administration. It is developing the project under a contract with the Energy Research and Development Authority of the New York State (Nyserda). Doreen Harris, President and Chief Executive Officer of Nyserda, said in a statement that the order to stop the work “goes against the prioritization of the Trump administration of independent and locally produced, and shows a complete disregard for an economic power station once in generation such as wind energy out of the sea.”

The movement sends a cooling signal to anyone investing in clean energy in the United States, added Harris. The same day that Equinor confirmed the pause of work in Empire Wind, E2, a group that promotes environmentally sustainable economic policies, said that he found that 16 net energy projects with a combined cost of $ 8 billion were abandoned only in the first three months of this year.

“Clean energy companies still want to invest in America, but uncertainty about Trump’s administration policies and the future of critical credits on net energy tax are clearly weighing,” said Michael Timberlake, E2 communications director, in a statement. “If this uncertainty of the self-inflicted and unnecessary market continues, we will almost certainly see more projects stopped, more construction stopped and disappear more job opportunities.”

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleThe permit process for channeling line 5 in Michigan is rapidly displayed
Next Article Views of Eastern construction | Engineering-Record News
Machinery Asia
  • Website

Related Posts

Bulldozer incident halts Pennsylvania demolition project

March 4, 2026

Data centers propelled Turner to record $29.2 billion in revenue by 2025

March 3, 2026

Excavator incident halts PA demolition project

March 3, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Average width of a car trailer

Bulldozer incident halts Pennsylvania demolition project

Data centers propelled Turner to record $29.2 billion in revenue by 2025

Excavator incident halts PA demolition project

Popular Posts

Average width of a car trailer

March 4, 2026

Bulldozer incident halts Pennsylvania demolition project

March 4, 2026

Data centers propelled Turner to record $29.2 billion in revenue by 2025

March 3, 2026

Excavator incident halts PA demolition project

March 3, 2026
Heavy Machinery

Average width of a car trailer

March 4, 2026

Buying guide for open aluminum trailers for long-distance vehicle transport

March 3, 2026

How to choose the right car trailer tool box

March 3, 2026

What is the safest speed for hauling car trailers

February 28, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.