Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป The CAPE COD bridge replacement program receives $ 1.09 million from Massdot Capital Investment Plan
Industry News

The CAPE COD bridge replacement program receives $ 1.09 million from Massdot Capital Investment Plan

Machinery AsiaBy Machinery AsiaJune 24, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The Massachusetts Transport Board of Directors approved a five -year capital investment plan of approximately $ 18.5 billion, including $ 1.09 million for the long -awaited CAPE COD codes program. At the age of 90, the Sagamore Bridge and the Bourne Bridge, the only roads on the CAPE COD channel, both are considered functionally obsolete by Massdot.

Most of the bottom of the plan to replace the two bridges would go to the construction of the first phase of the new Sagamore bridge. The bridges are owned by the United States Army Engineers Corps, but according to an agreement between the State and the Corps, Massdot will be responsible for the replacement projects and will have, will operate and maintain the two new bridges after they are completed. The planned twin bridges would also include shared paths for pedestrians and cyclists.

It is estimated that the replacement of the two bridges will cost more than $ 4.5 billion, according to media reports, including $ 2.1 billion for Sagamore. The state has already reached $ 2.3 billion for the project, including various federal grants and appropriations, as well as state good.

The army body estimates that the maintenance of the existing bridges over the next 50 years would cost $ 775 million. According to the media reports, the pre -construction of the new bridges begun earlier this year, and the construction is expected to begin in 2027.

The capital investment plan also assigns more than $ 1 billion for the Massachusetts Bay transport authority, including funding for electricity system updates.

In addition to the Cape Cod and MBTA bridge funds, the plan also has $ 424 million for the multimodal allston I-90 project; $ 276 million for the I-195 for the rotation of the 18th exchange in New Bedford; $ 210 million for I-90/I-495 exchange improvements to Hopkinton and Westborough; $ 241 million to replace the Kernwood Avenue bridge over the Danvers River and the Hall-Whitaker Drawbridge on the Bass River in Beverly and Salem; $ 269 million to support the Rourke bridge replacement in Lowell; $ 176 million to replace the Arthur J. McKenna bridge to Springfield and West Springfield and $ 149 million to advance projects that support West-East Rail.

There are also funds for bicycle and pedestrian infrastructure and local roads and bridges, as well as $ 14 million for the reconstruction of the runway for the Beverly Regional Airport.

“Each transport investment is an investment in people, connecting them to jobs, schools, health care and one another,”, The secretary and CEO of Massdot said in a statement. “We now have a strong five -year capital investment plan that reflects our shared priorities and provides us with the tools to continue to build a more connected and equitable Massachusetts.”

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleWinch’s utility trailer: Why do you need a
Next Article McCarthy, Jacobs completes $ 664 million in California
Machinery Asia
  • Website

Related Posts

Jacobs-McCarthy JV begins work on $185 million California water project

June 23, 2026

Superior Construction CEO: “All good mentors were at one point”

June 23, 2026

Toronto hospital tower moves ahead with $1-2 million in acquisitions

June 23, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Jacobs-McCarthy JV begins work on $185 million California water project

Superior Construction CEO: “All good mentors were at one point”

Toronto hospital tower moves ahead with $1-2 million in acquisitions

Project data should speed up decisions, not slow them down

Popular Posts

Jacobs-McCarthy JV begins work on $185 million California water project

June 23, 2026

Superior Construction CEO: “All good mentors were at one point”

June 23, 2026

Toronto hospital tower moves ahead with $1-2 million in acquisitions

June 23, 2026

Project data should speed up decisions, not slow them down

June 23, 2026
Heavy Machinery

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

As a double-axle tilting trailer facilitates the transport of vehicles and equipment

June 5, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.