Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Skanska, Flatirondragados wins a $ 1B DC updating bridge
Industry News

Skanska, Flatirondragados wins a $ 1B DC updating bridge

Machinery AsiaBy Machinery AsiaJuly 8, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Do us know if you have comments.

Prize: AwardRailway
Value: Billion dollars
Location: Washington, DC
Customer:Virginia Passengers Rail Authority

A joint company of Skanska and Broomfield, based $ Billion contract to build The Long Bridge North project in Washington, DC

The railway link approximately 1 kilometer, built for the Virginia Passengers Railway Authority, will extend from the Potomac East Park to the DC Benante of Le’nfant. The bridge is the first part of an important two -phase initiative to expand the freight and passenger rail service in the hallway.

The Long Bridge North Project is part of the wider bridge project of 1.8 miles that will replace the two -track DC system in Arlington, Virginia, with a series of modern railway bridges and railway aisles on four linked tracks. The intention is to relieve traffic and congestion.

It The wider effort will also include According to the project page, a new pedestrian bicycle or bridge that will cover the Potomac river and connect the Long Bridge Park directly to the Potomac Parks Eastern and West.

Reformed Eastern tracks, which currently serve goods and passengers traffic, will mainly serve CSX Freight Rail, while newly built western tracks will be mainly adapted to the passenger services provided by Amtrak and Virginia Railway Express.

Annually, 2 million Amtrak passengers and 3 million Vre travelers cross the current long bridge, which operates with 98% capacity during rush hours, according to the project page.

Everything you explain, 1.8 miles of railway over seven new bridges, will represent the global project of $ 2.3 billion, which has been in the works since 2011, according to the project page. The construction will begin this month with the end of the fourth quarter of 2030, according to the launch of Flatirondragados.

“Skanska is proud to lead the construction team and work for the Long Bridge North project, which will greatly improve the freight and passengers rail service in the capital region,” said Michael Viggiano, executive vice president of Skanska USA Civil, in a statement. “With financing in place and planning and approval now, this highly complex and critical infrastructure project is ready for the shovel.”

General’s Skanska Fifty The contract is $ 658 millionaccording to a launch of the company. Flatirondragados did not specify his part of the contract.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleGet it right with on-board weighing – Volvo CE
Next Article รถดั้ม 6 ล้อ MITSUBISHI ลากดิน l Dump&Truck l Excavator 2017 l P&P Clips Channel
Machinery Asia
  • Website

Related Posts

The GAO report finds a lengthy review process for hazard mitigation efforts in the US

October 1, 2026

Capture continuous job site data with autonomous drone services

October 1, 2026

From data to decisions: getting financial insights

October 1, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

3 Alternatives to the Harbor Freight Trailed Backhoe

The GAO report finds a lengthy review process for hazard mitigation efforts in the US

Capture continuous job site data with autonomous drone services

From data to decisions: getting financial insights

Popular Posts

3 Alternatives to the Harbor Freight Trailed Backhoe

October 1, 2026

The GAO report finds a lengthy review process for hazard mitigation efforts in the US

October 1, 2026

Capture continuous job site data with autonomous drone services

October 1, 2026

From data to decisions: getting financial insights

October 1, 2026
Heavy Machinery

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

2 Place Car Trailer: How To Choose The Right Two Car Transporter For Vehicle Transport?

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.