Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Of the archives: December 6, 1928
Industry News

Of the archives: December 6, 1928

Machinery AsiaBy Machinery AsiaJuly 11, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

ENR 150th birthday

This 1928 cover shows two railway erection cars that build the new main bridge on the main line of the Pennsylvania railway on the Wabash River in Terre Haute, Ind.

Various techniques were used in this work that advanced the method to place the plate beams at a new level.

The 125 feet of 70 tonne length that rises to the position is heavier than any beam placed by erection cars before.

Standard erection cars were 50 feet long and equipped with a 50 -foot boom and included standard assembly and counterweight engines.

The platforms that appear here, however, have 70 -foot tail booms and tail beams, which take the horizontal component of the boom voltage.

Each queue beam, which extends beyond their erected car, was located to rest on a bogie and 28 tons of additional pork iron counterweight.

Erigent cars were equipped with auxiliary booms linked to the sides of cars to anchor cars against the ball when heavy loads were changed.

A steel equilibrium beam was used to divide the weight of the beam in equal parts between the two erected cars. Seaboard Construction Co., from Philadelphia, is doing the work seen here.

The eight double -track extensions on the bridge included 32 beams, which were erected in 35 working days.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleJohn Deere 8345 RT 😎 #tractor #agro #farming #landwirtschaft #agriculture #traktor
Next Article Doosan SVM4100 Walk Around
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.