Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Skanska Tech adoption plan deployed at Laguardia Airport
Industry News

Skanska Tech adoption plan deployed at Laguardia Airport

Machinery AsiaBy Machinery AsiaAugust 7, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

O'connell

O’connell

Skanska Usa Building Co. It has an eight -step process that he uses to evaluate all his new technologies, which he deployed in the construction of the redevelopment of Terminal B of Laguardia Airport in New York City. Skanska selected CMBUILDER, a platform that offers interactive places simulations and published it throughout its team to put it ready.

Danielle O’Connell, Principal Director of Emerging Technology at Skanska, says that a problem for a contractor as great as Skanska is that several teams will want to use different technological platforms.

“Are we still using this tool? Who uses it? Where are they? What projects are they? Things like that,” he says. “This has helped us to have a better idea of who will pilot what and where. [The eight-step plan] It allows us to connect equipment from all over the country that may have similar challenges and then they can talk. “”

Skanska piloted the 3D logistics platform in the Laguardia Airport project and obtained positive comments from the pilot, allowing the company to achieve internal approval to expand the wider use of CMBUILDER in several projects.

The eight steps of the Skanska method are quite simple: define a problem; Check if there are sanctions or locks of roads to use new technologies; Pilot financing and approval; Sellers’ qualifications; Hiring, kickoff pilot; Pilot evaluation and a recommendation to the whole organization.

“Then we are thinking of climbing, another reason this process is underway is to look at what makes sense and only makes sense for a specific type of project in a certain geography,” says O’Connell. “Is it something we want to climb in the company?”

Skanska claims that CMBUILDER was local successful because many of the functions used by the teams working on the project were previously PDF that could be united on a platform based on the web more accessible to the stakeholders.

“The whole idea was to democratize this 4D logistics planning; we are using 3D models, and we were possibly using animations to show the phase and logistics and communicate what happens in the workplace,” he says.

After feedback and communication with the seller and teams, CMBUILDER was adopted and published in other projects. There was an immediate purchase because logistics was a point of pain through the table.

“Megaprojects that are multi -developed offer the opportunity to do R&D in technology,” says Michael Zeppieri, Skanska Cto. “This is a low marginal business … Technology is still perceived as an additive cost, and it can be very difficult to justify … unless one of these projects are already in this test space to try something.”

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleFEMA cannot repopulate billions in danger of mitigation of danger, the rules of the judge
Next Article Industrial Leads for the week of August 11 2025
Machinery Asia
  • Website

Related Posts

Hundreds dead when 7.5 magnitude earthquake collapses buildings in Venezuela

June 26, 2026

Technip-led team wins bid for $7.2m Mozambique floating LNG facility

June 26, 2026

US Department of Energy offers $17.5 million carrot to speed up new nuclear plants

June 25, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Hundreds dead when 7.5 magnitude earthquake collapses buildings in Venezuela

Technip-led team wins bid for $7.2m Mozambique floating LNG facility

US Department of Energy offers $17.5 million carrot to speed up new nuclear plants

Energy Department offers $17.5 million carrot to speed up nuclear plant components and projects

Popular Posts

Hundreds dead when 7.5 magnitude earthquake collapses buildings in Venezuela

June 26, 2026

Technip-led team wins bid for $7.2m Mozambique floating LNG facility

June 26, 2026

US Department of Energy offers $17.5 million carrot to speed up new nuclear plants

June 25, 2026

Energy Department offers $17.5 million carrot to speed up nuclear plant components and projects

June 25, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.