Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Francis Scott Key Bridge reconstructs the plans of the minor course of change
Industry News

Francis Scott Key Bridge reconstructs the plans of the minor course of change

Machinery AsiaBy Machinery AsiaAugust 22, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Maryland’s transport officials have proposed to alter the route of the new Key Francis Scott bridge in Baltimore to try to accelerate construction and limit environmental impacts.

Originally planned to occupy the footprint of the Patapse river of the original 1.7-mile steel bridge, which collapsed after being hit by a disabled container boat in the early hours of March 26, 2024, the new two-mile-long cable structure will be built on a parallel alignment about 260 feet southeast.

According to Maryland’s transport authority, the movement allows the work of the new structure to increase while the demolition of the remaining portions of the Old Bridge occurs, eliminating a possible obstacle to fulfill the date of completion of the autumn currently planned. In addition to avoiding the excess waste of the collapsed structure, the agency hopes to minimize the disruptive effects of the dredging of the remaining bridge below the mud line, which could have water quality effects downstream on the Bay of Chesapeake.

As the proposed plan of reference involves a change in the environmental permit of the project, it must be approved by the Maryland Environment Department and the State Public Works Council. MDTA has not said how long this process will take. Since its inception in July, demolition work at the Old Bridge has first focused on eliminating the remaining bridge sections that extend to the Patapse river. Once this work is completed, workers will eliminate the remaining ground level sections, followed by the buttresses.

Designed by Kiewit Infraestructure Co. By virtue of the first phase of $ 73 million of a progressive design construction contract, the new bridge will be longer and higher than that of its background in the 70’s, providing a higher vertical and horizontal surface to accommodate the increasingly large boats shouting in the port of Baltimore. The design calls for the two main pylons of 600 feet high to separate by more than 1,600 feet, with the roof of the bridge at 230 feet above a deeper management channel about 1,000 feet wide.

New pylons will also have an online collision protection system with the standards recommended for AASHTO for such bridges.

The National Transport Safety Board, which continues to investigate the collapse that killed six construction workers, indicated a vulnerability orientation document of March 18, 2025, that the four 28 -foot navigation channels of diameter, fibrated on the rubber built along the old navigation channel 700 feet wide from the width of the width of the KEY bridge width.

In the meantime, the test batteries are expected to be driven to the PatapSco river of the Patapse river next month. The total cost of the replacement bridge has been estimated at $ 1.7 billion, although MDTA says it plans to issue a revised cost and calendar this fall.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous Article#skidsteer Mini Skid Steer Loader: Compact Power for Tough Jobs | Best Mini Loader 2025
Next Article Mini Skid Steer Loader EPA Engine Wheels Track BucketFree official Skid Steer Loader Attachments
Machinery Asia
  • Website

Related Posts

Canada to Wyoming Pipeline Gets Presidential Permit to Go Ahead

May 1, 2026

Bridger Pipeline Expansion Gets Presidential Permit for Canada-Wyoming Crude Line

May 1, 2026

Lessons from the debate over Maine’s data center moratorium on construction

May 1, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Canada to Wyoming Pipeline Gets Presidential Permit to Go Ahead

Bridger Pipeline Expansion Gets Presidential Permit for Canada-Wyoming Crude Line

Lessons from the debate over Maine’s data center moratorium on construction

Construction views to the east | Engineering News-Register

Popular Posts

Canada to Wyoming Pipeline Gets Presidential Permit to Go Ahead

May 1, 2026

Bridger Pipeline Expansion Gets Presidential Permit for Canada-Wyoming Crude Line

May 1, 2026

Lessons from the debate over Maine’s data center moratorium on construction

May 1, 2026

Construction views to the east | Engineering News-Register

May 1, 2026
Heavy Machinery

How to secure a car on a trailer safely step by step

April 30, 2026

Folding car trailer buying guide for small garage and easy storage

April 27, 2026

How does car trailer size affect towing capacity

April 17, 2026

Metal car trailer ramps make loading easier and safer

April 13, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.