Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » The new President of the FERC, Rosner, describes the priorities: “We must build, build, build”.
Industry News

The new President of the FERC, Rosner, describes the priorities: “We must build, build, build”.

Machinery AsiaBy Machinery AsiaSeptember 23, 2025No Comments5 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The President of the Federal Energy Regulatory Commission, David Rosner, exposed his priorities during his first meeting open on September 18 as head of the agency, including the desire to broadcast soon on how data centers can be collapsed with electric power stations in the interconnection of PJM.

“My priorities as president are the same as when I was a curator,” Rosner said. “I am working hard with my colleagues to make decisions quickly, fair and independent. Network reliability as a job number has not changed.”

Rosner, a Democrat, replaced Mark Christie, a Republican, as President of the Ferc after Christie left the agency in early August. Rosner joined Ferc in June 2024. With Republicans Laura Swett and David Lacerte Advancing the Senate confirmation process To fill the two empty seats of the agency, the time that Rosner will be president is not clear.

In discussing his priorities, Rosner said he is focused on allowing economic growth through “abundant and affordable energy”.

He said he is “very excited” by the infrastructure.

“I think we have to build, build, build,” said Rosner. “America needs all the electrons and all the molecules of all kinds we can obtain, and we need more infrastructure to move it … reliable and affordable energy, it is not only a prerequisite to ensure the safety and safety of the North -American people, but it is also completely critical to win the AI ​​breed, reduce the manufacture and ensure a prosperous economy.”

Ferc is focused on developing “precise, clear and stable market price signs for new infrastructure built in places where it is needed,” said Rosner. This means connecting the new generation to the network faster and fair and fair decisions on issues related to pipes, hydroelectrics, liquefied natural gas and transmission lines.

Address the PJM placement review

Resolve the slopes PJM COLOCATION DOCKET It is a maximum priority, according to Rosner. In installation arrangements, data centers receive electricity directly from a nearby electric power station.

“It’s also a very complicated topic,” said Rosner. “My colleagues and I have been working hard on it. I am very excited with the placement and everything that is in the middle and achieving the rules of the road in its place so that we can unblock all these new technologies, get them on the network and get the data centers to be built.”

The FERC curator, Lindsay, echoed Rosner’s comments on the placement procedure.

“My office has deeply engaged in these issues and I look forward to ending it,” said See.

In an interview, Christie regretted his inability to issue a decision to place before leaving the agency on August 8.

“I was very promoted by a set of guidelines, which were called for all regulated entities, to protect consumers from cost change and protect reliability, and could not get two other votes,” said Christie on September 18.

The result of the revision could establish a precedent for the load placed on the Ferc’s superviers of the electric markets.

Fast decisions and regulatory certainty

During Ferc’s open meeting, see that part of his goal in Ferc is to make “tension correct” between making quick decisions and regulatory certainty.

“I never want us to be the maintenance when it comes to the necessary development of infrastructure and allowing decisions,” said See. “We play a critical role in doing a necessary policy in a fair, predictable and legally durable way.”

See that while attending Gastech, an annual fair, in Milan, earlier this month, he spoke with the leaders of the gas industry “ who said that as much as they value the speed at what we do, and trust me, they also want a strong confidence that the orders we emit are worth their weight and will remain when they are tested in court. ”

See that hopes that in the near future Ferc will launch a process to create a “blanket certificate” program for GNL export facilities molded after A Ferc has for gas pipelines and other facilities. A blanket certificate allows a gas company to carry out certain routine activities in its facilities without obtaining a specific FERC permission for each individual project.

The United States has become the largest GNL exporter in the world, with exports of 11.9 billion cubic feet daily last year, according to the United States Energy Information Administration.

The United States has eight GNL export terminals that can manage 14.5 BCF/D and eight are being built that could export about 21.8 BCF/D, according to FERC.

Another 10 export projects for a total of 13.2 Bcf/D They have been approved, but they were not under construction from September 9, according to Ferc. Ferc is reviewing two GNL export applications and there are two projects in the pre-leadership process of the agency, according to the commission.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleKubota ZT 155 Plowing #automobile #machinerychannel #farmequipment
Next Article JCB funny video 🤣🤣🤣 #jcb #pets #jcbbaba #funny #cute #cat #comedy #youtubeshorts #shorts #trending
Machinery Asia
  • Website

Related Posts

Massachusetts contractor faces $4.6 million fine after fatal trench collapse

April 2, 2026

$27 million metadata center pushes Louisiana toward massive power expansion

April 2, 2026

Sociable: Meta describes the benefits of AI for the US construction industry

April 2, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Massachusetts contractor faces $4.6 million fine after fatal trench collapse

$27 million metadata center pushes Louisiana toward massive power expansion

Sociable: Meta describes the benefits of AI for the US construction industry

Construction views to the east | Engineering News-Register

Popular Posts

Massachusetts contractor faces $4.6 million fine after fatal trench collapse

April 2, 2026

$27 million metadata center pushes Louisiana toward massive power expansion

April 2, 2026

Sociable: Meta describes the benefits of AI for the US construction industry

April 2, 2026

Construction views to the east | Engineering News-Register

April 1, 2026
Heavy Machinery

Car Trailer vs Equipment Trailer How to choose the right one

March 26, 2026

Car trailer with hydraulic drop cover makes loading faster and safer

March 23, 2026

Car trailer turn box guide for safe and efficient towing

March 20, 2026

How much weight can a flatbed car transporter trailer carry?

March 16, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.