Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Merit, Water/Environment Award: SANTEE COOPER CROSS AND WINYAH ELG PROJECTS
Industry News

Merit, Water/Environment Award: SANTEE COOPER CROSS AND WINYAH ELG PROJECTS

Machinery AsiaBy Machinery AsiaOctober 13, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

SANTEE COOPER CROSS AND WINYAH ELG PROJECTS


Monck Corner, SC


Prize of merit


Sent by Stantec Consulting Services


Owner SANTEE COOPER


Lead design company, structural/civil/MEP Stantec Consulting Services


Gc/cm Thompson Construction Group


Technology provider Chilem water solutions




The projects at the Cross and Winyah stations of South Carolina were designed to treat the combustion gas disulfurization effluents and to comply with the US EPA’s EPAs limitation guidelines for Arsenic, Selenium, Mercury and Nitrates. On December 31, 2025, the complete regulatory fulfillment was required to meet the strict limits, the project team designed and built two similar wastewater treatment systems in parallel and in a adjusted calendar.

At the beginning of 2023, Santee Cooper made the decision to operate its Winyah generating station through the date of the EPA for the cessation of coal energy generation. The decision doubled the project and left just over two years to engine for, acquire and build the wastewater treatment system in time to meet the period of compliance.

The crews led 5,090 piles of support for the Foundation and installed more than 11,000 C of concrete. The project also included 631 new teams, 300 tonnes of structural steel and more than 34,000 linear new pipe. The crews installed more than two kilometers of main HDPE underground strength pipes. The road crossed a railway in two places and passed under the existing storm drainage pipes. The team decided to say directional throughout the main line of force, which eliminated security concerns for open excavations and reduced the number of erosion controls needed. The strategy ultimately saved time and costs.

Despite the reduction of the time line, the $ 305 million project was delivered to the calendar and the budget.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticlePajero Derek Mobil F1?! #shorts #f1 #pajero
Next Article $5,000+ skid steer landscaping job! #landscaping
Machinery Asia
  • Website

Related Posts

Construction views west | Engineering News-Register

July 25, 2026

The boom in data center construction brings a new focus to security

July 24, 2026

Construction views west | Engineering News-Register

July 24, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Construction views west | Engineering News-Register

How much does a minicar cost? New vs Used Buyer’s Guide: Direct Minicarts

The boom in data center construction brings a new focus to security

Construction views west | Engineering News-Register

Popular Posts

Construction views west | Engineering News-Register

July 25, 2026

How much does a minicar cost? New vs Used Buyer’s Guide: Direct Minicarts

July 25, 2026

The boom in data center construction brings a new focus to security

July 24, 2026

Construction views west | Engineering News-Register

July 24, 2026
Heavy Machinery

Is a tilt deck trailer better than ramps?

July 17, 2026

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.