Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Merit Prize, Specialized Construction: Chastain Horse Park
Industry News

Merit Prize, Specialized Construction: Chastain Horse Park

Machinery AsiaBy Machinery AsiaOctober 14, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Chastain Horse Park


Marietta, ga.


Prize of merit


Sent by Macallan construction


Owner Chastain Horse Park


Lead design firm TS Adams Studio Architects


General contractor Macallan construction


Structural engineer Shear structural


Civil engineer Van der watt engineering


MEP engineer Barrett, Woodyard & Associates


Program Manager Partners of Grove Street


Landscape architect More associated lands




The Macallan Construction Project team transformed one of the last two remaining urban horses parks in the United States. The scope of the project included extensive renewals in existing facilities and the addition of several new structures to meet the demands of increasing programs.

The work included the construction of a therapeutic cavalry center, two new covered sands, a community boarding bar and a manager to support staff operations on the site.

At the beginning of the project, only two of the eight planned components of the project were designed. In the meantime, funding was insufficient to fully execute vision. Macallan Construction was commissioned by Valor Engineering the design to align with resources, retaining essential programmatic elements.

As the construction of the first barn began, the owner achieved additional funding beyond the original projections. This allowed the team to reflect to expand the scope of the project while the program was completed for the remaining buildings.

Ultimately, the three -year project was delivered below the budget and the calendar.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleHot line maintenance 400KV line #yt #engineering #electric #workoutmotivation #terex #viralvideo
Next Article USED VOLVO 480 FOR SALE – USED EXCAVATOR FOR SALE – USED CONSTRUCTION EQUIPMENT FOR SALE
Machinery Asia
  • Website

Related Posts

People of Texas and the Southeast: April 2026

April 7, 2026

Duke Energy Girds for the Future

April 7, 2026

TxDOT gets all on board as construction ramps up

April 7, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

People of Texas and the Southeast: April 2026

Duke Energy Girds for the Future

Tilt trailer cylinder explained for real-world load efficiency

TxDOT gets all on board as construction ramps up

Popular Posts

People of Texas and the Southeast: April 2026

April 7, 2026

Duke Energy Girds for the Future

April 7, 2026

Tilt trailer cylinder explained for real-world load efficiency

April 7, 2026

TxDOT gets all on board as construction ramps up

April 7, 2026
Heavy Machinery

Tilt trailer cylinder explained for real-world load efficiency

April 7, 2026

Triple axle tilting trailer for the transport of vehicles and heavy equipment

April 7, 2026

Gooseneck trailer with tilting deck for transporting heavy equipment and vehicles

April 3, 2026

Tilt trailer with winch for easier vehicle loading and safer transport

April 3, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.