Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home ยป Merit Prize, Specialized Construction: Chastain Horse Park
Industry News

Merit Prize, Specialized Construction: Chastain Horse Park

Machinery AsiaBy Machinery AsiaOctober 14, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Chastain Horse Park


Marietta, ga.


Prize of merit


Sent by Macallan construction


Owner Chastain Horse Park


Lead design firm TS Adams Studio Architects


General contractor Macallan construction


Structural engineer Shear structural


Civil engineer Van der watt engineering


MEP engineer Barrett, Woodyard & Associates


Program Manager Partners of Grove Street


Landscape architect More associated lands




The Macallan Construction Project team transformed one of the last two remaining urban horses parks in the United States. The scope of the project included extensive renewals in existing facilities and the addition of several new structures to meet the demands of increasing programs.

The work included the construction of a therapeutic cavalry center, two new covered sands, a community boarding bar and a manager to support staff operations on the site.

At the beginning of the project, only two of the eight planned components of the project were designed. In the meantime, funding was insufficient to fully execute vision. Macallan Construction was commissioned by Valor Engineering the design to align with resources, retaining essential programmatic elements.

As the construction of the first barn began, the owner achieved additional funding beyond the original projections. This allowed the team to reflect to expand the scope of the project while the program was completed for the remaining buildings.

Ultimately, the three -year project was delivered below the budget and the calendar.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleHot line maintenance 400KV line #yt #engineering #electric #workoutmotivation #terex #viralvideo
Next Article USED VOLVO 480 FOR SALE – USED EXCAVATOR FOR SALE – USED CONSTRUCTION EQUIPMENT FOR SALE
Machinery Asia
  • Website

Related Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Inspector dead, four workers injured in Kansas interstate construction zone crash

Popular Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026

Inspector dead, four workers injured in Kansas interstate construction zone crash

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.