Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Award of Merit, Sports/Entertainment: New Alamein City Tourist Promenade
Industry News

Award of Merit, Sports/Entertainment: New Alamein City Tourist Promenade

Machinery AsiaBy Machinery AsiaDecember 13, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

New tourist promenade of the city of Alamein


New Alamein City, Egypt


Award of Merit, Sports/Entertainment


Presented by The Arab Contractors (Osman Ahmed Osman & Co.)


Owner: New Urban Communities Authority


Main design company: New Alamein City Development Authority


Contractor: The Arab Contractors (Osman Ahmed Osman & Co.)




Located along the Mediterranean coast, the $36.6 million project transforms the waterfront into a vibrant public promenade. Designed to promote sustainability and community use, the first phase covers about half of the planned 8.7-mile stretch and includes pedestrian and bicycle paths, landscaped parks, man-made lakes, interactive fountains and solar lighting.

The design includes energy-efficient technology and modern infrastructure for water, power and irrigation, emphasizing environmental responsibility and urban livability. A major engineering element includes four bridges and an overpass crossing the railway line to improve connectivity between districts.

Coastal conditions, characterized by high groundwater and saline, erosion-prone soils, required specialized geological studies and durable construction techniques. The team synchronized the promenade with the surrounding infrastructure, such as utilities and nearby roads, requiring precise design integration and step-by-step coordination.

Environmental preservation and climate resilience were prioritized through assessments that protected dunes and vegetation, while construction adapted to marine exposure.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Project, Electrical/Industrial: Macau Waste Incineration Plant — Phase 3
Next Article Merit Award, Power/Industrial: Combined Cycle Implementation at the Santa Cruz Thermoelectric Power Plant
Machinery Asia
  • Website

Related Posts

FERC orders grid operators to change data center power rules

June 18, 2026

British Columbia to terminate $3 million Fraser River tunnel contract, rebid project

June 18, 2026

Saudi Arabia moves ahead with $7 million rail land bridge project

June 18, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

FERC orders grid operators to change data center power rules

British Columbia to terminate $3 million Fraser River tunnel contract, rebid project

Saudi Arabia moves ahead with $7 million rail land bridge project

Virginia approves 6-year, $28.5 million infrastructure plan

Popular Posts

FERC orders grid operators to change data center power rules

June 18, 2026

British Columbia to terminate $3 million Fraser River tunnel contract, rebid project

June 18, 2026

Saudi Arabia moves ahead with $7 million rail land bridge project

June 18, 2026

Virginia approves 6-year, $28.5 million infrastructure plan

June 18, 2026
Heavy Machinery

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

As a double-axle tilting trailer facilitates the transport of vehicles and equipment

June 5, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.