Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home ยป Best Airport/Transit: Lynnwood Link Extension
Industry News

Best Airport/Transit: Lynnwood Link Extension

Machinery AsiaBy Machinery AsiaDecember 15, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Lynnwood link extension


Seattle


BEST PROJECT


Presented by HNTB Corp.


owner Sound traffic


Leading design company HNTB-Jacobs JV


General Contractor Stacy & Witbeck/Hoffman JV (SKH); Skanska


Road engineer KPFF


Structural Engineer HNTB; Jacobs; KPFF


MEP engineer IMAGE



An 8.5-mile expansion brings Sound Transit’s Link light rail system from north Seattle to Snohomish County, giving the county its first light rail extension. The $3.3 billion project is expected to serve 55,000 daily users by 2026.

The scope of work included new light rail tracks and station extensions spanning four city jurisdictions and WSDOT’s I-5 right-of-way, including the realignment of a long-haul crossing over the interstate, which presented multiple technical, logistical and jurisdictional challenges and required meticulous planning to minimize disruption. Extensive stakeholder involvement was also necessary.

Early design packages allowed construction to begin prior to full design completion, a strategy that ensured completion was scheduled for August 2024. But given the project’s route through busy areas, construction activities were carefully sequenced to minimize disruption and ensure the safety of workers, commuters and nearby communities. Advanced modeling also helped reduce risks and maintain safe working conditions.

Lynnwood link extension

Photo courtesy HNTB

Halfway through the project, a fifth station was added to the project at NE 130th Street. The equipment changed to allow for the additional reach, and despite the addition, the extension was delivered on time and on budget. The team also managed the realignment of a long-haul interchange over I-5 and integrated multimodal transfer facilities, which helped minimize disruption and improve connectivity, ensuring minimal disruption to highway traffic.

Lynnwood City Center Station is the first Sound Transit project to achieve LEED Gold certification, with the project achieving a 30% reduction in energy cost, a 34% reduction in indoor water use and an 81% diversion of construction waste from landfills. Temporary soldier pile walls helped preserve 97% of the wetlands near McAleer Creek.

Each station throughout the expansion features custom square designs, unique color palettes, and original artwork based on community input. The stations were designed for accessibility, safety and user experience, incorporating intuitive layouts, ADA-compliant features and multi-modal connections.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleFeds’ push to block liquid nail purchases shows cost risks in materials consolidation industry
Next Article Granite embarks on $24 million Southern California rail project
Machinery Asia
  • Website

Related Posts

Defense Authorization Act signed into law, blocking progressive design and construction

December 22, 2025

Port Authority Board Approves 10-Year, $45 Million Capital Plan

December 22, 2025

Massachusetts and Vermont partner to strengthen transportation resilience

December 20, 2025
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Defense Authorization Act signed into law, blocking progressive design and construction

Port Authority Board Approves 10-Year, $45 Million Capital Plan

The best car towing shift for safe, controlled and stress-free loading of vehicles

Aluminum tilt bed trailer explained for real world transportation needs

Popular Posts

Defense Authorization Act signed into law, blocking progressive design and construction

December 22, 2025

Port Authority Board Approves 10-Year, $45 Million Capital Plan

December 22, 2025

The best car towing shift for safe, controlled and stress-free loading of vehicles

December 22, 2025

Aluminum tilt bed trailer explained for real world transportation needs

December 22, 2025
Heavy Machinery

The best car towing shift for safe, controlled and stress-free loading of vehicles

December 22, 2025

Aluminum tilt bed trailer explained for real world transportation needs

December 22, 2025

TYPHON Machinery Named eBay Exporter of the Year 2025, Cementing Its Leadership in Global Compact Equipment

December 19, 2025

Long-term durability where water meets road

December 15, 2025

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.