Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home ยป Award of Merit, Sports/Entertainment: Seattle Aquarium Ocean Pavilion
Industry News

Award of Merit, Sports/Entertainment: Seattle Aquarium Ocean Pavilion

Machinery AsiaBy Machinery AsiaDecember 16, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Seattle Aquarium Ocean Pavilion


Seattle


Merit Award


Presented by Turner Construction Co.


owner Seattle Aquarium Society


Leading design company LMN Architects


General Contractor Turner Construction Co.


Civil/Structural Engineer Magnusson Klemencic Associates


MEP engineer PAE Consulting Engineers


Exhibition design design




Combining living habitats, hands-on exploration and behind-the-scenes features, the $141 million, 50,000-square-foot Ocean Pavilion sets itself apart from other aquariums by highlighting the interconnectedness of human and marine life.

Completing this installation required early sequencing and detailed logistical planning between the three main project teams. The reef’s main structure involved custom CNC foam formwork, 335 tonnes of rebar and 720m3 of concrete placed in a single 22-hour pour. Over 435,000 feet of MEP and life support systems were precisely modeled and installed along with over 200 pieces of equipment.

A walk with views over and inside the aquarium structure was built, which required careful coordination of overlapping tower cranes, bridge falsework and rigging. Temporary steel girders were installed to transfer the bridge loads around the critical life support and electrical rooms, allowing work on both features to be carried out safely and efficiently.

The all-electric building and its integrated life support and MEP systems reduce energy consumption, while semi-enclosed saltwater habitats recirculate 96% of seawater. Recycled rebar and low-carbon concrete helped reduce embodied carbon by 32%. These efforts helped the project achieve LEED Gold certification. It also aims for Zero Carbon certification.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Office/Retail/Mixed Use: TikTok USDS Bellevue
Next Article Award of Merit, K-12 Education: Washington School for the Deaf, Divine Academic and Hunter Gymnasium
Machinery Asia
  • Website

Related Posts

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

August 25, 2026

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Popular Posts

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

August 25, 2026

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.