Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » MTA seeks more electric capacity on commuter lines
Industry News

MTA seeks more electric capacity on commuter lines

Machinery AsiaBy Machinery AsiaJanuary 22, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The Metropolitan Transport Authority it has more railways that it would like to electrify.

The transit agency issued a request for proposals for a design-build contract along the Metro-North Railroad Hudson line that, among other tasks, will see contractors electrify about 11.5 miles of track.

The stretch, which is south of the Croton-Harmon stop, is the only four-track on the route that does not have a third lane, according to the application document. A single, diesel-only track where all the others are electric is an unusual arrangement, said Blair Lorenzo, executive director of the Effective Transit Alliance, an organization that advocates for improving transit in the New York region.

The construction site is within what the MTA calls its “third rail territory,” or 102 miles of Metro-North that have electric capacity and span the Hudson, New Haven and Harlem lines. In September last year, the department announced that new Siemens Mobility Charger locomotives were starting to operate specifically along the Husdon line. While the tracks’ older models only run electrically in the Grand Central Terminal tunnels, the Charger locomotives are built for long-distance, high-speed electric travel, Lorenzo said. Completing this latest electrification on the Hudson line would allow the new models to run without diesel as far as Croton-Harmon.

“At ETA, we believe electrifying New York’s commuter rail network should be a high priority, especially on high-traffic lines like the Hudson Line,” said Lorenzo.

The organization advocates, however, catenary conversions instead of third lanes, because the former is cheaper, safer to repair and allows for higher top speeds.

The MTA declined to comment on this particular request for proposals or what it means for the deployment of electric commuter trains. The agency’s 2025-2029 capital plan notes that the MTA plans to continue buying new diesel-electric locomotives for the Metro-North and replace the deteriorating third rail on all train lines.

In addition to completing electric train capabilities in the area, the contractor will also replace four below-grade bridges and complete four rock slope stabilization projects along the Hudson line.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleTwo dams now shape the post-2026 reality of the Colorado River
Next Article Annual construction spending falls as manufacturing work declines
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.