Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home ยป University of Kansas moves forward on $362 million Phase II Gateway District expansion and Jayhawks Stadium
Industry News

University of Kansas moves forward on $362 million Phase II Gateway District expansion and Jayhawks Stadium

Machinery AsiaBy Machinery AsiaFebruary 2, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The University of Kansas has tapped a JE Dunn and Clark Construction joint venture to deliver a $362 million Phase II project that is slated to improve football facilities, expand the campus entrance and add mixed-use development.

The work in Lawrence, Kansas is part of an $809 million redevelopment that it included an important renovation and reconstruction of the David Booth Kansas Memorial Stadium south-west, west and north sides, together with related facilities. Phase I, led by Turner Construction Company, opened in August 2025.

Kansas City-based design firms HNTB and Multistudio provided architecture and design services for both phases, covering the stadium and the adjacent Gateway District, located east of the stadium.

Phase II is planned to rebuild the stadium’s eastern bleachers with new seating and amenities, remodel the south side of the bowl and build a year-round district that includes a 162-room hotel, 450-bed student housing, 43,000 square feet of retail, office and restaurant space, an underground parking garage and an event garage.

“The project will develop a new campus gateway, multi-purpose space and upgraded football facilities, enhancing KU’s ability to recruit and retain students,” the university said.

Phase I, at the corner of 11th and Mississippi streets, cost $448 million and connected the Anderson Family Soccer Complex, Booth Stadium and a 50,000-square-foot conference center at the north end of the stadium. Renovations included a new equipment room overlooking the field, an additional 20,000 square feet of visiting, meeting and support space, and improved locker, weight and training rooms.

The first phase also reconfigured the seating bowl to improve vision and bring fans closer to the field, added new concession offerings, improved concourse circulation and accessibility, and introduced premium seating options such as clubs, ledge suites and seating. All west side seats now include seatbacks, with around 3,000 access to premium areas. The west side has four club areas and 42 suites.

University officials said the Gateway District is scheduled to be fully completed by 2028, with stadium work scheduled during the offseason following the 2026 and 2027 football seasons.

Kansas Football was established in 1890, playing in what is recognized as the first stadium built on a college campus west of the Mississippi River. Booth Stadium is the seventh oldest collegiate stadium in the country, according to the university.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleStony Brook University seeks partner for mixed-use housing, Energy P3
Next Article French-led consortium to build $6 million water desalination and pipeline project in Jordan
Machinery Asia
  • Website

Related Posts

French-led consortium to build $6 million water desalination and pipeline project in Jordan

February 2, 2026

Stony Brook University seeks partner for mixed-use housing, Energy P3

February 2, 2026

Skanska Begins $104 Million Johns Hopkins Library Reconstruction

February 2, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

French-led consortium to build $6 million water desalination and pipeline project in Jordan

University of Kansas moves forward on $362 million Phase II Gateway District expansion and Jayhawks Stadium

Stony Brook University seeks partner for mixed-use housing, Energy P3

Skanska Begins $104 Million Johns Hopkins Library Reconstruction

Popular Posts

French-led consortium to build $6 million water desalination and pipeline project in Jordan

February 2, 2026

University of Kansas moves forward on $362 million Phase II Gateway District expansion and Jayhawks Stadium

February 2, 2026

Stony Brook University seeks partner for mixed-use housing, Energy P3

February 2, 2026

Skanska Begins $104 Million Johns Hopkins Library Reconstruction

February 2, 2026
Heavy Machinery

Car hauler trailer kit basics for real world towing

January 26, 2026

Hydraulic tilting gooseneck trailer for transporting heavy equipment

January 26, 2026

Aluminum car trailer with tilt bed explained for real world vehicle transport

January 26, 2026

What is the best cover for a car trailer?

January 23, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.