Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home ยป Rays reveal renderings of the New Tampa Ballpark, a mixed-use development
Industry News

Rays reveal renderings of the New Tampa Ballpark, a mixed-use development

Machinery AsiaBy Machinery AsiaFebruary 12, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The Tampa Bay Rays have released the first set of concept drawings for their $2.3 billion mixed-use stadium project to be located on a 113-acre site leased from Hillsborough College in Tampa.

Plans call for a 31,000-seat stadium, smaller than any existing permanent Major League Baseball stadium, to be open in time for the 2029 season and offer multiple seats, concourse areas and year-round event spaces. An adjacent “Champions Quarter” neighborhood could include “hotels, commercial space, multifamily buildings, sports and health-related buildings, commercial buildings, parking structures, restaurants and other related buildings,” according to the team’s January 2026 non-binding memorandum of understanding (MOU) with the university.

No contractor has been named for the project, which the Rays say is being designed by a Populous-led team that also includes Gensler, Kimley-Horn, RCLCO, Beck, Walter P Moore, Terracon and ME Engineers. Mortenson had been tapped for an earlier plan to build a $1.3 billion stadium for the Rays as the centerpiece of a proposed redevelopment of St. Petersburg’s 86-acre historic gas plant district. The stadium component was abandoned shortly after a new ownership group took control of the team last September.

Known as Hillsborough College’s Dale Mabry Campus, the proposed development site is across from Raymond James Stadium and adjacent to George M. Steinbrenner Field, the New York Yankees’ spring training facility that served as the Rays’ temporary home last season after 2024 Hurricane Milton tore fabric panels from the dome roof and damaged areas of the Tropicana building. The repairs are expected to be completed in time for the team’s first home game in 2026, the first of three seasons remaining on its contract to play at the 36-year-old multi-use stadium owned by the City of St. Petersburg.

The Rays’ MOU with Hillsborough College, which calls for a minimum 99-year lease for the new stadium and mixed-use property, says construction of the stadium and mixed-use development “shall be done in a manner that minimizes interference” with the school’s operations and activities, including demolition of existing campus structures and construction of temporary facilities. In addition, new academic facilities are to be built on a portion of the site that will remain under university ownership.

According to local news reports, the cost of building the stadium is to be split between the Rays, Hillsborough County and the city of Tampa, with the team paying at least half and covering overpasses, repairs and maintenance and future capital improvements. All mixed-use elements must be privately financed.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleIsrael’s major $49 million Tel Aviv Metro acquisition process begins
Next Article BLS: Construction Employment in January
Machinery Asia
  • Website

Related Posts

Critical Path | Engineering News-Register

September 26, 2026

Supervisors and Field Managers Are Overburdened: Can Agent AI Monitoring Help?

September 26, 2026

Why professional indemnity insurance is ticking the clock for AE firms

September 26, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

This is the most important part of a backhoe

VIDEO: A shirtless man takes a backhoe on a promenade, destroys signs and lampposts

Critical Path | Engineering News-Register

Supervisors and Field Managers Are Overburdened: Can Agent AI Monitoring Help?

Popular Posts

This is the most important part of a backhoe

September 27, 2026

VIDEO: A shirtless man takes a backhoe on a promenade, destroys signs and lampposts

September 26, 2026

Critical Path | Engineering News-Register

September 26, 2026

Supervisors and Field Managers Are Overburdened: Can Agent AI Monitoring Help?

September 26, 2026
Heavy Machinery

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

2 Place Car Trailer: How To Choose The Right Two Car Transporter For Vehicle Transport?

September 22, 2026

3-Car Wedge Trailer: How can it improve vehicle transportation efficiency?

September 21, 2026

Single Axle Tilt Trailer: What you need to know before you buy?

September 20, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.