Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » New Mexico fines DOE’s Los Alamos nuclear complex $16 million for delayed waste cleanup
Industry News

New Mexico fines DOE’s Los Alamos nuclear complex $16 million for delayed waste cleanup

Machinery AsiaBy Machinery AsiaFebruary 19, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

New Mexico officials announced a $16 million fine and other actions against the US Department of Energy for failing to “prioritize” the cleanup and disposal of nuclear and chemical waste left over from research and production of weapons components at the giant World War II-era Los Alamos National Laboratory near Santa Fe.

State Environment Secretary James Kenney also ordered on Feb. 11 a review of the disposal permit for the estimated 25,000-acre site for the Waste Isolation Pilot Plant, the underground federal repository for defense-related transuranic waste near Carlsbad, NM, to increase the volume of future waste disposals from Los Alamos.

Between 2021 and 2025, five times more waste was disposed of at Idaho National Laboratory’s WIPP than at Los Alamos, according to the state agency, DOE’s Office of Environmental Management.

DOE “has not met [state] requirements to clean up legacy waste at Los Alamos National Laboratory and prioritize disposal of that waste at the Waste Isolation Pilot Plant,” he said. “New Mexicans have stepped up to help solve the nation’s cleanup problem in a way that residents of no other state have.”

The Los Alamos complex, first built in 1943 for the Manhattan Project’s nuclear weapons mission and now comprised of nearly 900 individual facilities, is still the only site in the United States for the production and testing of plutonium for the US arsenal. Other key missions include advanced research related to national security, materials science, supercomputing, renewable energy and nuclear physics. The Department of Energy estimates that approximately 500,000 cubic meters of legacy waste remains at the site, although more recently Los Alamos is investigating the use of its nuclear waste as a source of tritium, a rare and expensive element now needed for the development of next-generation fusion power.

The state’s civil penalty includes $6 million related to hazardous waste violations and a 2024 consent order directing the Los Alamos site’s management of a groundwater chromium plume that was discovered in 2005 to migrate off-site and on the San Ildefonso Pueblo reservation, the agency said, which also required the DOE to submit for approval a revised plan of interim measures. In addition, the state collected a $9.78 million civil penalty related to groundwater rule violations, which required DOE to develop within 60 days a cleanup and mitigation plan and a revised groundwater discharge permit application.

The state is also challenging DOE’s postponement of the cleanup of “Materials Disposal Area C,” an 11.8-acre unlined landfill containing radioactive waste, heavy metals and hazardous chemicals dating to the 1940s, located above a regional drinking water aquifer.

Looking for quick answers on construction and engineering topics?
Try Ask ENR, our new intelligent AI search tool.

Ask ENR →

The DOE argued in hearings last year that the area is now in “active facility operations,” so it sought to postpone cleanup action. In the Feb. 11 order, the state orders Los Alamos to provide evidence within 30 days to determine next steps.

In an email response to a request for comment from a New Mexico publication, a DOE spokesman said the department is “progressing on the environmental cleanup of the legacy at [Los Alamos] and remains committed to public safety, efficiency and transparency.”

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleData centers can leverage batteries, microgrids for faster interconnection: NEMA
Machinery Asia
  • Website

Related Posts

Data centers can leverage batteries, microgrids for faster interconnection: NEMA

February 18, 2026

AECOM to take advantage of TomTom’s location technology

February 18, 2026

US offshore wind construction plots on course to grow despite Trump’s battles

February 18, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

New Mexico fines DOE’s Los Alamos nuclear complex $16 million for delayed waste cleanup

Data centers can leverage batteries, microgrids for faster interconnection: NEMA

AECOM to take advantage of TomTom’s location technology

US offshore wind construction plots on course to grow despite Trump’s battles

Popular Posts

New Mexico fines DOE’s Los Alamos nuclear complex $16 million for delayed waste cleanup

February 19, 2026

Data centers can leverage batteries, microgrids for faster interconnection: NEMA

February 18, 2026

AECOM to take advantage of TomTom’s location technology

February 18, 2026

US offshore wind construction plots on course to grow despite Trump’s battles

February 18, 2026
Heavy Machinery

30ft boat trailer for heavy offshore vessels and road trailer

February 12, 2026

Aluminum trailer car

February 9, 2026

Hydraulic tilting trailer kit

February 9, 2026

Why car trailer weight is so important for safe towing

February 4, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.