Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home » Contractors warned of a £3.2bn framework
Industry News

Contractors warned of a £3.2bn framework

Machinery AsiaBy Machinery AsiaJuly 13, 2023No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Contractors are being sought for a repair and installation framework worth up to £3.2 billion.

Social housing consortium EN:Procure is calling for tenders for its new framework for projects in Yorkshire, Humberside, the East Midlands and the North West of England.

Jobs covered by the framework include refurbishment, maintenance, repairs and minor construction work, as well as the installation of technology and energy efficiency measures in homes, commercial buildings and infrastructure assets.

Contractors are expected to develop their own social value strategies during the life of the framework, which will run from the end of this year until 2027.

An earlier version of the framework, launched in 2019, delivered more than £275 million in repairs, maintenance and installation, EN:Procure said.

CA: Procure is part of Efficiency North, which also provides employment and training, land development and funding and support for social and economic regeneration.

CEO Lee Parkinson said: “Following the success of the current version of the framework over the past four years, we look forward to welcoming bids for this next iteration.

“As well as providing a great service for those using the framework to procure installation and repair work, successful applicants will also need to match Efficiency North’s commitment to the training and development of ‘skills, including the use of learning’.

Prequalification questionnaires must be returned by September 1, 2023. More information available here.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleWhy the transparency of contractors and architects cannot be overlooked
Next Article Barratt’s legacy problems reached £180m
Machinery Asia
  • Website

Related Posts

Under the data center boom

February 1, 2026

Prices of construction materials fell slightly in December, but were still up from more than a year ago

January 31, 2026

Court rules Cook County misused $243 million in transportation funds

January 31, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Under the data center boom

Prices of construction materials fell slightly in December, but were still up from more than a year ago

Court rules Cook County misused $243 million in transportation funds

Construction views to the east | Engineering News-Register

Popular Posts

Under the data center boom

February 1, 2026

Prices of construction materials fell slightly in December, but were still up from more than a year ago

January 31, 2026

Court rules Cook County misused $243 million in transportation funds

January 31, 2026

Construction views to the east | Engineering News-Register

January 31, 2026
Heavy Machinery

Car hauler trailer kit basics for real world towing

January 26, 2026

Hydraulic tilting gooseneck trailer for transporting heavy equipment

January 26, 2026

Aluminum car trailer with tilt bed explained for real world vehicle transport

January 26, 2026

What is the best cover for a car trailer?

January 23, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.