Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » From the Archives: July 5, 1984
Industry News

From the Archives: July 5, 1984

Machinery AsiaBy Machinery AsiaJune 4, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

ENR 150th anniversary

The restoration of the Statue of Liberty, seen on this cover from 1984, presented numerous challenges.

Liquid nitrogen at -320°F was used to remove seven layers of interior paint, followed by baking soda blasting to remove one layer of coal tar paint. The heaviest part of the job was replacing the iron frame, a network of 1,350 iron bars ending in 1,500 U-shaped copper saddles, riveted to the 80-tonne copper envelope.

Condensation and leaking rainwater had caused galvanic action between the armor and the mounting saddles, resulting in significant corrosion.

The iron bars were replaced with low carbon stainless steel bars insulated with Teflon sleeves.

Nab Construction Corp. he was the steel contractor. More powerful air handling units were installed to reduce interior temperature and humidity.

The outer scaffolding was an 81-foot rectangle that rose 250 feet and was never less than 18 inches from the statue.

The shoulder of the statue needed reinforcement, as the sculptor, Auguste Bartholdi, had changed the position of the shoulder and arm next to the torch, against the wishes of engineer Gustave Eiffel.

The 3,500-ton torch had suffered so much corrosion from leaking alterations that it had to be replaced. Lehrer/McGovern was construction manager. The restoration was completed in time for the statue’s centennial celebration in 1986.

Looking for quick answers on construction and engineering topics?
Try Ask ENR, our new intelligent AI search tool.

Ask ENR →

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAI in construction: from more work to better work
Next Article Walbridge begins construction on $16 million Stargate data center
Machinery Asia
  • Website

Related Posts

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

August 25, 2026

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Popular Posts

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

August 25, 2026

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.