Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Burns & McDonnell is leading program management as the 30-mile pipeline moves forward
Industry News

Burns & McDonnell is leading program management as the 30-mile pipeline moves forward

Machinery AsiaBy Machinery AsiaJune 12, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

A $400 million, 30-mile-long pipeline planned to bring water from Lake Michigan to the communities of Montgomery, Oswego and Yorkville, Illinois, in Chicago’s west-end suburbs, is under construction.

The WaterLink project, which officially broke ground June 10, is expected to provide drinking water to about 90,000 residents, expand the Lake Michigan water service region and replace reliance on a depleting aquifer.

Burns & McDonnell is providing program management and construction observation on behalf of the pipeline owner/operator, the DuPage Water Commission, supporting 12 contract packages in various counties and jurisdictions. The project uses a Design-Bid-Build delivery method across all packages, resulting in smaller segments being individually competitively bid and built by general contractors.

The project is the result of nearly a decade of studying future water needs during which the communities determined that their current water source, the Ironton-Galesville Deep Sandstone Aquifer, will not be able to meet projected demand as early as 2050.

“WaterLink includes transmission mains up to 54 inches routed through established communities, ComEd rights-of-way and major highways, railroads, utilities and river crossings. Eleven of the 30 main transmission miles are routed to ComEd utility easements, reducing project costs, schedule and construction impact on communities,” says Paul May, director general of the water commission.

“WaterLink brings together the technical complexity and community purpose that define critical infrastructure,” adds Joe Darlington, WaterLink program manager at Burns & McDonnell, noting that the project will require coordination with many stakeholders.

In 2021, after a technical, financial and environmental analysis, the municipalities formally partnered to seek a new water source and identified Lake Michigan water delivered through the water commission as the new source.

Burns & McDonnell says the project includes multiple municipal delivery points and requires complex infrastructure work spanning residential neighborhoods, roads and utility easements. Construction began in December 2025 and will continue through 2028, paid for by a combination of federal loans and local funding.

The main one begins in the western suburb of Naperville, Illinois and runs west across major highways and the Fox River before reaching destination communities. The project is expected to continue until 2028.

Other contractors involved in the project include: Arcadis, Bowman Consulting Group, Christopher B. Burke Engineering, LAN (Lockwood, Andrews & Newman), Robinson Engineering, Stanley Consultants, Benchmark Construction Co., Airy’s Inc. and Water Well Solutions Illinois Division.

  • Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticlePunch List: Turner highlights World Cup builds, AECOM takes DHS contract
    Next Article Illinois’ 30-mile, $400 million water pipeline is moving forward
    Machinery Asia
    • Website

    Related Posts

    13-year, $2 million New York Bridge rehab completes eighth of 11 projects

    October 16, 2026

    Blattner is a contractor for the $750 million wind power project in South Dakota

    October 16, 2026

    Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

    October 16, 2026
    Leave A Reply Cancel Reply

    • Facebook
    • Twitter
    • Instagram
    • Pinterest
    Don't Miss

    Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

    Kingsport Times News | Local news, weather and sports

    13-year, $2 million New York Bridge rehab completes eighth of 11 projects

    Blattner is a contractor for the $750 million wind power project in South Dakota

    Popular Posts

    Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

    October 17, 2026

    Kingsport Times News | Local news, weather and sports

    October 17, 2026

    13-year, $2 million New York Bridge rehab completes eighth of 11 projects

    October 16, 2026

    Blattner is a contractor for the $750 million wind power project in South Dakota

    October 16, 2026
    Heavy Machinery

    How to choose the right car trailer for your vehicle?

    October 15, 2026

    How to choose between single axle and tandem axle trailers

    September 30, 2026

    Custom trailers designed for the way you work

    September 29, 2026

    Daily Trailer Knowledge: Something About Trailer Tires

    September 22, 2026

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    Type above and press Enter to search. Press Esc to cancel.