Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Best Renovation/Restoration: Milken Center for Advancing the American Dream, Phase 2
Industry News

Best Renovation/Restoration: Milken Center for Advancing the American Dream, Phase 2

Machinery AsiaBy Machinery AsiaOctober 7, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Milken Center for Advancing the American Dream, Phase 2

Washington, D.C

BEST PROJECT

Sent by: Grunley Construction Inc.

Owner: The Milken Foundation

Main design company: Associates Shalom Baranes

General contractor: Grunley Construction Co.

Subcontractors: Freestate Electrical Construction Co.; Summit Construction Inc.; Wagner Roofing Co.; Shapiro and Duncan; Worcester Eisenbrandt Inc; Evergreene Architectural Arts Inc; Shickel Corp.; Innovo Construction; Scaffold resource; Lorton Stone; The Berlin Steel Construction Co.

Once featured on the back of the $10 bill, the former Riggs National Bank and American Security and Trust Co. buildings. are among the most prominent institutions in Washington, DC. In 2018, Grunley Construction was selected to provide the adaptive reuse of the structures, transforming the three historic buildings into the Milken Center for Advancing the American Dream, an interactive museum.

The project required addressing three defining challenges: building a theater below grade beneath fully supported historic buildings, expanding the structures vertically without compromising the fragile interiors, and restoring iconic spaces while integrating modern systems. The city’s height restrictions limited vertical expansion, making it essential to excavate below buildings to meet space requirements.

The strategy required complex support and structural stabilization. When geotechnical investigations revealed challenging subsurface conditions, the team developed a custom foundation solution that included 330 micropiles, temporary interior supports, and extensive lateral bracing.

Among the most complex challenges of the project was the vertical expansion of the one-story additions to Building 1503 and Building 1501. This required the removal of the roof while maintaining and protecting the historic plaster ceilings. To safeguard them, a custom temporary support system was installed 30 feet above ground level to allow closed access above and free access below. This allowed work to be done simultaneously.

Milken Center

Photo by Ulf Walin

The trusses in the 1503 building space were designed to go from load-bearing wall to load-bearing wall. The trusses of Building 1501 were designed to join the exterior scaffolding towers, as the existing windows prevented the use of the load-bearing wall. Once in place, the truss system was crowned with scaffolding. A temporary roof was installed to protect the building as the original roof was removed.

With the structure in place, a permanent plaster support was installed from above. The bank’s historic rooms were restored and a glass atrium was added. The exterior works included the restoration of the facade with replicated terracotta and prefabricated elements; masonry repairs; and restoration of ornamental bronze doors and light fixtures.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAOM Office/Retail/Mixed Use: 600 Fifth | Engineering News-Register
Next Article AOM Renovation/Restoration: Marine Barracks Washington Building 8
Machinery Asia
  • Website

Related Posts

Sustainability Merit Award: Swarthmore College Martin Hall

October 7, 2026

AOM Renovation/Restoration: Marine Barracks Washington Building 8

October 7, 2026

AOM Office/Retail/Mixed Use: 600 Fifth | Engineering News-Register

October 7, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

ACE secures 74 backhoe orders from Ministry of Defense | CNBC-TV18 posted on the topic

Sustainability Merit Award: Swarthmore College Martin Hall

AOM Renovation/Restoration: Marine Barracks Washington Building 8

Best Renovation/Restoration: Milken Center for Advancing the American Dream, Phase 2

Popular Posts

ACE secures 74 backhoe orders from Ministry of Defense | CNBC-TV18 posted on the topic

October 7, 2026

Sustainability Merit Award: Swarthmore College Martin Hall

October 7, 2026

AOM Renovation/Restoration: Marine Barracks Washington Building 8

October 7, 2026

Best Renovation/Restoration: Milken Center for Advancing the American Dream, Phase 2

October 7, 2026
Heavy Machinery

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

2 Place Car Trailer: How To Choose The Right Two Car Transporter For Vehicle Transport?

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.