Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » The ISG college job has been delayed due to “labour supply” issues.
Industry News

The ISG college job has been delayed due to “labour supply” issues.

Machinery AsiaBy Machinery AsiaSeptember 19, 2023No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

ISG was unable to deliver a £21.6m university in West Sussex before the start of term due to labor supply issues, a council meeting has heard.

The contractor was due to deliver the 100-pupil Woodlands Meed College building for students with special educational needs in time for the start of the new academic year earlier this month, but ran into the term

The school’s facilities include a hydrotherapy pool, all-weather pitches, a multi-sports hall, spacious classrooms, outdoor play areas, a gymnasium and an amphitheater.

At a West Sussex County Council committee meeting last week, a council director alluded to the contract containing liquidated damages clauses, but said he could not specify them publicly.

It was learned at the meeting that the project was on target for August 25 and a contingency of a week later, but it is still not finished.

Andrew Edwards, director of property and assets at the local authority, said: “We were told in the week that they wouldn’t make it to the 31st, basically performance fell off a cliff. The targets they should have met they were not reached that week.

“The problem behind this is a well-documented problem in the construction industry [namely] supply chain issues, meaning availability of both labor and materials. In this case, I think it was a work issue. ISG had [then] flooded the place with manpower [to get the programme back on track] but there comes a point where you have parts falling on top of each other and stuff [not] in sequence.”

Jacquie Russell, the council’s cabinet member for learning, whose LinkedIn profile lists her as a former director of a construction project management company who is now a part-time property developer, said on August 2 he was told that the work would be finished. before August 25.

“I asked the contractor directly, ‘Do you think you’ll be ready in three weeks?’ And he looked at me hard and said, ‘Yes, we will, but if not, there will be a warning.’

“I know what a construction site can look like from one week to the next – it can look like a bomb hit it one week and it can be completely clear the next,” he said, commenting on the difficulty of judging the reliability of such a guarantee . .

No new date for the project’s completion has been announced, as Russell said the council needed to “stress test” ISG’s latest estimate before revealing it.

Russell added: “I believe the contractor’s response in terms of allowing us to confirm the new date has been unduly slow, and I am sorry that it is adding to the situation and the frustrations of parents and staff at Woodlands. Meed .”

ISG was appointed for the job through the Southern Construction Framework. Construction began in November 2021.

The contractor has been contacted for comment.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleChoosing the right thumbnail bucket size [2022]
Next Article Blue Diamond Miniature Cold Glider Review [2022]
Machinery Asia
  • Website

Related Posts

Backlog bounces, stays misaligned in build

March 11, 2026

Worley, Bloomfire Deploy AI Platform for Industrial Project Customers

March 11, 2026

6 contech companies raise a total of $126 million

March 11, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Backlog bounces, stays misaligned in build

Worley, Bloomfire Deploy AI Platform for Industrial Project Customers

6 contech companies raise a total of $126 million

Feds announce $100 million to support public transit during World Cup

Popular Posts

Backlog bounces, stays misaligned in build

March 11, 2026

Worley, Bloomfire Deploy AI Platform for Industrial Project Customers

March 11, 2026

6 contech companies raise a total of $126 million

March 11, 2026

Feds announce $100 million to support public transit during World Cup

March 11, 2026
Heavy Machinery

What most buyers get wrong before transporting their first vehicle

March 5, 2026

Tandem axle aluminum utility trailer

March 5, 2026

Average width of a car trailer

March 4, 2026

Buying guide for open aluminum trailers for long-distance vehicle transport

March 3, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.