Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Bidders asked for a £50m Lincs frame
Industry News

Bidders asked for a £50m Lincs frame

Machinery AsiaBy Machinery AsiaOctober 31, 2023No Comments1 Min Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

North East Lincolnshire Council is looking for contractors for a four-year capital works framework worth £50m.

The work will include internal and external construction, including repairs, maintenance and rehabilitation, as well as work on new property projects.

It also covers extensions to council-owned assets such as leisure centres, schools and academies.

Equans Services, responsible for the provision of the council’s regeneration and infrastructure services since 2010, manages the framework.

The council said places under the £50m capital works framework would be awarded “based on 100 per cent quality criteria”. Applications are open until November 24.

The framework will run from April 2024 to March 2028.

Equans is contracted to provide regeneration services to the council until June 2025.

The agreement provides for the company to provide property and facility management, including security; architecture, surveying and civil engineering; highway infrastructure and maintenance; building planning and control.

Current capital projects in North East Lincolnshire include the £42m South Humber Industrial Investment Programme, which includes infrastructure projects in the Humber Estuary.

In addition, Grimsby (pictured) has received £20.9m from the Government’s Towns Fund to deliver six projects, including a new public square and improved pedestrian and cycle routes.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleTop 5 BIM Myths Busted
Next Article Best Office/Retail/Mixed Use – Augusta Community Innovation Center (THE HUB)
Machinery Asia
  • Website

Related Posts

Road projects capture 77% of $1.74 million in BUILD grants

July 11, 2026

Structural concerns force emergency closure of Maryland office building

July 11, 2026

On the ground, engineers assess the damage in the Venezuela earthquake zone

July 11, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Road projects capture 77% of $1.74 million in BUILD grants

Structural concerns force emergency closure of Maryland office building

On the ground, engineers assess the damage in the Venezuela earthquake zone

A man, believed to be a project worker, dies in the fall at the STO Building Group site in London

Popular Posts

Road projects capture 77% of $1.74 million in BUILD grants

July 11, 2026

Structural concerns force emergency closure of Maryland office building

July 11, 2026

On the ground, engineers assess the damage in the Venezuela earthquake zone

July 11, 2026

A man, believed to be a project worker, dies in the fall at the STO Building Group site in London

July 11, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.