Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป The 5 main causes of construction demands
Industry News

The 5 main causes of construction demands

Machinery AsiaBy Machinery AsiaNovember 13, 2023No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Infrastructure and capital projects are hit hard by rising financing costs, inflation and costly lawsuits, but the latter problem is one that builders have some power to mitigate. Contractors can empower themselves by understanding the causes of cost disputes and overruns, and curb the loss of money and time that these disputes commonly incur.

This is according to Crux’s sixth annual global vision report construction claims and disputes. The research comes from HKA, a London-based consultancy specializing in construction risk mitigation and dispute resolution, which looked at 1,800 projects in 106 countries.

In the Americas, the main causes of conflict in a project were:

  1. Scope changes.
  2. Incorrect design.
  3. Deficiencies in the workforce.
  4. Unforeseen physical conditions.
  5. Incomplete design.

The impact of this conflict is huge: disputed costs of projects in the Americas reached more than a third of their value, the report found, averaging $100 million, or 33.6% of capital expenditures. U.S. general contractors are being squeezed by inflation and rising borrowing costs, and as a result are less likely to settle and try to maximize their recovery from litigation, the report said.

Construction sectors are also disproportionately affected by claims and disputes. Buildings and transportation infrastructure projects faced claims for longer time extensions than other sectors, while delays tended to be the least severe in industry and manufacturing. The shift in scope particularly slowed offshore projects, both oil and gas (53.6%) and wind (45.0%), while poor planning and coordination largely account for an uptick in rail disputes.

Headwinds for builders

Inflation, high interest rates and tight labor markets continue to pose challenges for builders, although the overall economy has shown greater resilience than expected, according to Crux. The report says construction “is unattractive to younger generations and female candidates”, but accessible trades education and greater investment in technology can help.

Another tip for reducing costly disputes? Slow down and communicate. Clients often pressure contractors to work faster and shorten schedules, while contractors may not communicate the difficulty of this for fear of straining relationships, leading to labor shortages and increased costs and deadlines . The report found that the extra time needed amid the COVID-19 pandemic to review and mature designs improved build capacity: design failure rates dropped 12 percentage points globally after the shutdown pandemic, from 47.6% to 35.5%.

“Late changes by a project owner cause a change in scope,” according to the report. “But more often this cause of conflict arises, as projects evolve, when both owners and design and construction teams discover design gaps and revise their views on specific elements of an asset’s operational requirements.”

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticlePeople of New York and New England: November 2023
Next Article Skanska director leaves suddenly after 28 years
Machinery Asia
  • Website

Related Posts

Proposed ICE detention center in New Hampshire draws criticism from Massachusetts governor

February 16, 2026

Injured ironworker settles construction fall case at Fermilab for $40 million

February 16, 2026

Despite “widespread industry disruption, unions report membership growth.”

February 15, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Proposed ICE detention center in New Hampshire draws criticism from Massachusetts governor

Injured ironworker settles construction fall case at Fermilab for $40 million

Despite “widespread industry disruption, unions report membership growth.”

TYPHON Machinery Named eBay Exporter of the Year 2025, Cementing Its Leadership in Global Compact Equipment

Popular Posts

Proposed ICE detention center in New Hampshire draws criticism from Massachusetts governor

February 16, 2026

Injured ironworker settles construction fall case at Fermilab for $40 million

February 16, 2026

Despite “widespread industry disruption, unions report membership growth.”

February 15, 2026

TYPHON Machinery Named eBay Exporter of the Year 2025, Cementing Its Leadership in Global Compact Equipment

February 14, 2026
Heavy Machinery

30ft boat trailer for heavy offshore vessels and road trailer

February 12, 2026

Aluminum trailer car

February 9, 2026

Hydraulic tilting trailer kit

February 9, 2026

Why car trailer weight is so important for safe towing

February 4, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.