Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » 4 tips for exposing underground utilities
Excavators

4 tips for exposing underground utilities

Machinery AsiaBy Machinery AsiaMay 13, 2023No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Excavating around underground utilities requires competent and well-trained equipment operators, a spotter, and most importantly, locations. Here are some helpful tips from licensed drainage layer and equipment operators to help you stay safe and efficient while looking for utilities.

Guide to safe procedures:

1) Call “Ontario One Call” and wait 7 days for the locations to be completed.

Always remember that buried services such as swimming pool, barbecue, irrigation and lighting that are installed privately are not included. Natural Gas and Hydro locates the finish at the meter.

2) Exposing existing utilities in the work area should be done with great care and vacuum excavation is preferred whenever possible. This will reduce the risk of any damage occurring due to unexpected contact between the excavation equipment and the buried plant. If machine excavation is required, it must be accompanied by manual excavation. Any excavation work within 1 meter on either side of a location mark is considered within the legal location and will require hand digging.

3) Whenever possible, it is proposed to accompany the locating technician and obtain in-depth readings on the utilities that are in the work areas. Removal of the soil above the buried floor should be done in layers until the utility is found by digging by hand and verified with the completed location. By removing soil in 6″ deep layers, both hand and machine digging can be used. First, the worker’s hand digs a shovel-width trench 6″ deep over the legal location area and ensures that there is no plant. The machine operator then carefully excavates to this depth over an area large enough for the worker to enter and repeat the manual excavation to another 6-inch shelf depth. This process is repeated until the plant is safely exposed and this process is repeated until the entire buried plant has been exposed to daylight.

4) When using a mini excavator or midi to help expose underground utilities, it can be very advantageous to have the operator’s door fully open and secured and position the rotating tower at 90 degrees. This method of operation is particularly useful when in a confined space or where two trenches join and the operator’s lines of sight into the trench are greatly reduced.

With these helpful tips, you can safely and efficiently research utilities and get the job done. As always, if you have any questions about the equipment to be used on these types of projects, please don’t hesitate to contact our team of skilled personnel ready to assist you with all of your landscape project needs. /construction!

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleCAS: 1.4 for 48 months SSL or CTL
Next Article CASE – 2.4 for 48 Midi excavators
Machinery Asia
  • Website

Related Posts

What’s the Lifespan of a Mini Excavator?

January 17, 2026

Avoid These Mini Excavator Buying Mistakes in 2026

January 15, 2026

The Ultimate Guide to Buying a 3 Ton Mini Excavator

January 10, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Dubai Airport Drone Tests Redundancy at Global Aviation Hub

Construction contract of St. Louis indicted on Federal Biking Program charges

Construction must lobby lawmakers on highway reauthorization bill: association executive

Worley wins FEED contract for $4m Cyprus gas field project amid region’s war chaos

Popular Posts

Dubai Airport Drone Tests Redundancy at Global Aviation Hub

March 16, 2026

Construction contract of St. Louis indicted on Federal Biking Program charges

March 16, 2026

Construction must lobby lawmakers on highway reauthorization bill: association executive

March 16, 2026

Worley wins FEED contract for $4m Cyprus gas field project amid region’s war chaos

March 16, 2026
Heavy Machinery

How much weight can a flatbed car transporter trailer carry?

March 16, 2026

How to choose the right aluminum deck trailer for heavy vehicles

March 16, 2026

Which material makes the car trailer steel or aluminum more durable

March 12, 2026

What most buyers get wrong before transporting their first vehicle

March 5, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.