You are at:Home » 4 tips for exposing underground utilities
Excavators

4 tips for exposing underground utilities

Machinery AsiaBy Machinery AsiaMay 13, 2023No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Excavating around underground utilities requires competent and well-trained equipment operators, a spotter, and most importantly, locations. Here are some helpful tips from licensed drainage layer and equipment operators to help you stay safe and efficient while looking for utilities.

Guide to safe procedures:

1) Call “Ontario One Call” and wait 7 days for the locations to be completed.

Always remember that buried services such as swimming pool, barbecue, irrigation and lighting that are installed privately are not included. Natural Gas and Hydro locates the finish at the meter.

2) Exposing existing utilities in the work area should be done with great care and vacuum excavation is preferred whenever possible. This will reduce the risk of any damage occurring due to unexpected contact between the excavation equipment and the buried plant. If machine excavation is required, it must be accompanied by manual excavation. Any excavation work within 1 meter on either side of a location mark is considered within the legal location and will require hand digging.

3) Whenever possible, it is proposed to accompany the locating technician and obtain in-depth readings on the utilities that are in the work areas. Removal of the soil above the buried floor should be done in layers until the utility is found by digging by hand and verified with the completed location. By removing soil in 6″ deep layers, both hand and machine digging can be used. First, the worker’s hand digs a shovel-width trench 6″ deep over the legal location area and ensures that there is no plant. The machine operator then carefully excavates to this depth over an area large enough for the worker to enter and repeat the manual excavation to another 6-inch shelf depth. This process is repeated until the plant is safely exposed and this process is repeated until the entire buried plant has been exposed to daylight.

4) When using a mini excavator or midi to help expose underground utilities, it can be very advantageous to have the operator’s door fully open and secured and position the rotating tower at 90 degrees. This method of operation is particularly useful when in a confined space or where two trenches join and the operator’s lines of sight into the trench are greatly reduced.

With these helpful tips, you can safely and efficiently research utilities and get the job done. As always, if you have any questions about the equipment to be used on these types of projects, please don’t hesitate to contact our team of skilled personnel ready to assist you with all of your landscape project needs. /construction!

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleCAS: 1.4 for 48 months SSL or CTL
Next Article CASE – 2.4 for 48 Midi excavators
Machinery Asia
  • Website

Related Posts

TYPHON Machinery Launches New xFlex Scissor Lift Series Designed for Safer and Smarter Modern Worksites

June 1, 2026

What’s the Lifespan of a Mini Excavator?

January 17, 2026

Avoid These Mini Excavator Buying Mistakes in 2026

January 15, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Trump’s offshore wind purchase deals grow to $2.5 billion, with more turbulence

33,000-seat tennis center with retractable roof spaces planned in Saudi Arabia

Project cost, risk responsibility was discussed at the Resilience Conference

Clayco recruits former OpenAI executive Zack Kass as board advisor

Popular Posts

Trump’s offshore wind purchase deals grow to $2.5 billion, with more turbulence

June 21, 2026

33,000-seat tennis center with retractable roof spaces planned in Saudi Arabia

June 20, 2026

Project cost, risk responsibility was discussed at the Resilience Conference

June 19, 2026

Clayco recruits former OpenAI executive Zack Kass as board advisor

June 19, 2026
Heavy Machinery

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

As a double-axle tilting trailer facilitates the transport of vehicles and equipment

June 5, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.