Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » The report from the Grenfell inquiry could take another six months
Industry News

The report from the Grenfell inquiry could take another six months

Machinery AsiaBy Machinery AsiaNovember 27, 2023No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The public inquiry into the Grenfell Tower fire has admitted it may not publish its final report before the seventh anniversary of the industry-changing tragedy.

An update issued by the team leading the investigation said the long-awaited paper was on hold due to the large volume of criticized parties that needed to be notified.

Retired judge Martin Moore-Bick was appointed on 28 June 2017 to lead the public inquiry into the huge fire that killed 72 people in west London two weeks earlier.

An initial report focusing on the events during the fire itself was published in October 2019. The second and final study, examining the causes of the tragedy, was initially expected this year, but had already slipped to early 2024.

Now, the latest update has made it clear that the post is taking a few months off.

“As things stand, the report will not be published before April next year, but the group hopes to be able to send it to the Prime Minister before the next anniversary of the fire, with publication shortly after.” , the investigation said in a statement.

The latest delay was attributed to a rule requiring correspondence with a large number of parties criticized in the document.

“Not only must we give recipients a reasonable amount of time to respond to potential criticisms, but we must also analyze their responses to decide whether we need to modify our interim findings or the way we have expressed them,” he said. the update

“However, we are probably halfway through the process, having sent over 100 letters so far.”

Once the final report is sent to the prime minister, it will be the government’s decision when to publish the landmark document. However, the government is widely expected to release the report immediately after receiving it.

Dame Judith Hackitt said last month Construction news that the industry should anticipate a “fundamental cultural shift” as the review of building safety prompted by its 2018 report on the lessons of the Grenfell Tower tragedy slowly got under way.

Meanwhile, ministers have started the process of hiring a replacement company to maintain the Grenfell Tower site. A contract notice said the £21.3m work would take an initial three years, with expressions of interest required by December 29.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticlePlanning for the year ahead: A look at how we build now
Next Article Best Water/Environmental project: Steinaker Service Canal
Machinery Asia
  • Website

Related Posts

Critical Path | Engineering News-Register

September 26, 2026

Supervisors and Field Managers Are Overburdened: Can Agent AI Monitoring Help?

September 26, 2026

Why professional indemnity insurance is ticking the clock for AE firms

September 26, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

VIDEO: A shirtless man takes a backhoe on a promenade, destroys signs and lampposts

Critical Path | Engineering News-Register

Supervisors and Field Managers Are Overburdened: Can Agent AI Monitoring Help?

Backhoe hits 50 Freeway overpass, breaks concrete

Popular Posts

VIDEO: A shirtless man takes a backhoe on a promenade, destroys signs and lampposts

September 26, 2026

Critical Path | Engineering News-Register

September 26, 2026

Supervisors and Field Managers Are Overburdened: Can Agent AI Monitoring Help?

September 26, 2026

Backhoe hits 50 Freeway overpass, breaks concrete

September 26, 2026
Heavy Machinery

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

2 Place Car Trailer: How To Choose The Right Two Car Transporter For Vehicle Transport?

September 22, 2026

3-Car Wedge Trailer: How can it improve vehicle transportation efficiency?

September 21, 2026

Single Axle Tilt Trailer: What you need to know before you buy?

September 20, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.