Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home ยป I-405 overpass hit by backhoe in 2022 finally to be torn down this weekend – KIRO 7 News Seattle
Backhoe Loader

I-405 overpass hit by backhoe in 2022 finally to be torn down this weekend – KIRO 7 News Seattle

Machinery AsiaBy Machinery AsiaDecember 22, 2023No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Beginning Friday, November 3 at 11:00 p.m. until 4:30 a.m. Monday, I-405 southbound will be fully closed.

The closure begins at the I-405/State Route 167 interchange via SR 181 or West Valley Highway.

The Washington State Department of Transportation will demolish the Lind Avenue overpass, which was struck and damaged by a trailer carrying a backhoe in June 2022.

Specifically, “every other beam” was damaged, according to WSDOT communications consultant Tom Pearce.

Five out of eight beams were damaged.

WSDOT determined that replacing the overpass would be the most effective option.

“Replacing individual joists would mean we’d take one joist out, we’d leave one joist in place, and then we’d have to reach in and take out the next joist,” Pearce said. “So what happens is you’re putting in five new girders. They might not be completely level like you can get when you build a new overpass. Replacing all the girders was the best way to go.”

Between 8 a.m. and 8 p.m. is when WSDOT expects the heaviest traffic in the Renton area, so Pearce recommends you try to plan your trip outside of those hours.

“We’re going to see backups on the streets of the city of Renton,” he said.

Detours include Talbot Road and Southwest Grady Way.

Detours for the southbound I-405 closure include Talbot Road and Southwest Grady Way.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleThieves use a construction backhoe to enter the store, dig into the ATM
Next Article Caterpillar 432 Side Shift Backhoe From: Caterpillar – Cat
Machinery Asia
  • Website

Related Posts

Martin Smith was crowned Scottish Champion of the 2024 Plant Operators Challenge

July 30, 2024

APOLLO 60HP TRACTOR + 4 IN 1 LOADER + BACKHOE for sale (reference code TA919034)

July 29, 2024

Government procures heavy-duty road construction machines for MMDA

July 28, 2024
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Critical Path | Engineering News-Register

Augmenta AI helps organize electrical work in schoolwork

In the Great Lakes area, a vehicle operated by divers installs new tunnel linings without the need for dewatering

Help preserve what makes America’s buildings safe

Popular Posts

Critical Path | Engineering News-Register

January 30, 2026

Augmenta AI helps organize electrical work in schoolwork

January 29, 2026

In the Great Lakes area, a vehicle operated by divers installs new tunnel linings without the need for dewatering

January 29, 2026

Help preserve what makes America’s buildings safe

January 29, 2026
Heavy Machinery

Car hauler trailer kit basics for real world towing

January 26, 2026

Hydraulic tilting gooseneck trailer for transporting heavy equipment

January 26, 2026

Aluminum car trailer with tilt bed explained for real world vehicle transport

January 26, 2026

What is the best cover for a car trailer?

January 23, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.