Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » 5 Advantages of Arbitration for Construction Disputes
Industry News

5 Advantages of Arbitration for Construction Disputes

Machinery AsiaBy Machinery AsiaJanuary 26, 2024No Comments4 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

A construction project without dispute is almost inconceivable.

In fact, a full 98% of construction projects generate a cost overrun or delays, according to McKinsey. Likewise, the design, engineering and management consultant Arcadis found it 70% of construction projects end complaints

Jacqueline Greenberg Vogt, Esq.

Jacqueline Greenberg Vogt

Courtesy of Mandelbaum Barrett PC

In the post-pandemic world, construction projects are ending up in litigation more often than ever, and with higher dollar values. In fact, the the construction industry had the third highest count and cost of legal filings among all US business sectors, according to a recent report by business credit rating agency Creditsafe.

All litigation is costly and time-consuming. But construction cases tend to take longer and are more expensive to litigate than other commercial cases because of the sensitive nature of the building and the sheer volume of documents involved.

As an alternative, Arbitration offers both time and cost savings. Benefits include:

time: Construction arbitration is much easier to schedule than litigation, which depends on the court’s docket, the availability of judges (and sometimes juries), and requires many months of discovery to reach a trial. On the other hand, the parties to the arbitration have the flexibility to schedule the hearing as they wish and, in fact, may also select an arbitrator who is available sooner.

Arbitration agreements also often require certain milestones in the dispute process within certain time frames, which litigation does not. They generally require a written decision within a certain period of time after the hearing, so they provide a quick result. Just try to bring this concept to court.

The truncated arbitration schedule can also allow a project to continue while pending, which reduces project delays.

expense: Most arbitrations involve limited discovery, such as sharing key documents and negotiating whether further exchanges of documents are necessary. On the other hand, litigation requires extensive discovery. In particular, the complex nature of the construction process leads to time-consuming and expensive exchanges of documents, depositions, and prior motions. Discovery also delays the resolution of a dispute.

Because time is money, achieving a quick resolution results in cost savings while keeping construction on track and saving on litigation costs.

Purpose: Arbitration awards are generally final (absent arbitrator error or misconduct) and enforceable in courts of all 50 states and the District of Columbia. Generally, a reviewing court will uphold the award as long as the arbitrator acted within his authority. Thus, in general, the parties to the arbitration can be confident that the process will result in a resolution and conclusion of the dispute.

confidentiality: Arbitration is a private process and, unlike litigation, parties can prevent the proverbial airing of their dirty laundry in public. The project’s private and sensitive information is preserved. Finally, the confidential nature of the procedures avoids reputational damage, thus preserving relationships between project participants that may be affected by a public conflict.

Flexibility: Because arbitration is a contract-based procedure, the parties are free to adapt anything and everything about it. From location to rules, selection of arbitrators, procedures and deadlines, parties can choose how they want to work together toward a resolution. In fact, the process can even be modified to suit the complexity of the dispute, leading to greater efficiency and satisfaction with the results.

Know the drawbacks

Of course, arbitration is not a panacea, and there may be good reasons to choose the litigation route. For example, some of the advantages of arbitration could be considered disadvantages, such as the limited ability to appeal a decision to a court and the more restricted discovery process, which means less information to help resolve the dispute. dispute

Ultimately, the choice between arbitration and litigation depends on the project, the parties and the dispute. Evaluating the above factors for each individual construction project is the best method for selecting the correct method of dispute resolution.

While arbitration isn’t always perfect, it might be right for your project.

Jacqueline Greenberg Vogt is chairman of the Construction Law Group at Mandelbaum Barrett PC, a law firm based in Roseland, NJ.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBiden administration halts LNG export authorizations for renewal of process
Next Article Bradford man arrested after alleged DUI with – and threats with – a backhoe | news
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.