Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » The German team completes the first of the twin Rhine cable-stayed bridges
Industry News

The German team completes the first of the twin Rhine cable-stayed bridges

Machinery AsiaBy Machinery AsiaFebruary 2, 2024No Comments1 Min Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Heavy vehicles on Germany’s north-south A1 motorway wishing to avoid Cologne will once again be able to cross the Rhine River at Leverkusen after the opening on February 4 of the first of the twin cable-stayed bridges.

Vehicles over 3.9 tonnes have been banned from the original bridge for nearly nine years after structural defects emerged.

After the new bridge was completed, a consortium including Hochtief AG and SEH Engineering GmbH. will begin demolishing the existing 59-year-old structure next to it and then build a second span twin on the site of the old bridge. When completed in 2027, the two crossings will offer 12 lanes of traffic.

Conceptually designed by Ingenieurbüro Grassl GmbH., both crossings feature central main spans 920 feet long and 110.5 feet wide supported by A-frame pylons on either side, rising nearly 200 feet above the covered The decks are made of steel box edge beams 20 feet wide by 12 feet deep joined by steel cross beams.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAlberta spent $900 million cleaning up abandoned wells, the report found
Next Article Alberta to spend $900 million on cleanup of abandoned wells by 2022, report says
Machinery Asia
  • Website

Related Posts

Supervisors and field managers are overworked, can Agent AI supervision help?

September 24, 2026

NC State will look into adopting improved construction helmets

September 24, 2026

California High-Speed ​​Rail Authority’s ‘Wasteful’ Spending Criticized by Its Inspector General

September 24, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Supervisors and field managers are overworked, can Agent AI supervision help?

NC State will look into adopting improved construction helmets

California High-Speed ​​Rail Authority’s ‘Wasteful’ Spending Criticized by Its Inspector General

New Virginia data center rules raise questions for construction

Popular Posts

Supervisors and field managers are overworked, can Agent AI supervision help?

September 24, 2026

NC State will look into adopting improved construction helmets

September 24, 2026

California High-Speed ​​Rail Authority’s ‘Wasteful’ Spending Criticized by Its Inspector General

September 24, 2026

New Virginia data center rules raise questions for construction

September 24, 2026
Heavy Machinery

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

2 Place Car Trailer: How To Choose The Right Two Car Transporter For Vehicle Transport?

September 22, 2026

3-Car Wedge Trailer: How can it improve vehicle transportation efficiency?

September 21, 2026

Single Axle Tilt Trailer: What you need to know before you buy?

September 20, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.