Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Granite wins $55 million road widening job in Tucson, Arizona
Industry News

Granite wins $55 million road widening job in Tucson, Arizona

Machinery AsiaBy Machinery AsiaFebruary 6, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Award: Subsidy Road improvement project
value: 55 million dollars
Location: Tucson, Arizona
Customer: Pima County Regional Transportation Authority

Watsonville, Calif.-based Granite Construction won one $55 million contract to widen a section of Grant Road in Tucson, Arizona, the contractor announced Jan. 31.

According to Granite, the project involves widening Grant Road to provide six passing lanes and a median with left turn lane pockets.

It also includes new sidewalks, curbs, landscaping, traffic signals, street lights and a detention pond. The underground work will include water main replacement, sewer additions, cross box culverts and storm drains, as well as a large 96-inch diameter culvert to mitigate storm runoff.

The granite will extend approximately 1.5 miles of the causeway, one of Tucson’s main surface thoroughfares, from Palo Verde Boulevard to Venice Place. The work is part of phase 3 and 4 of the larger phase Subsidy Road improvement project which has been ongoing since at least 2013, when it is the first phase was completed.

This project, in turn, is part of $2.1 billion Pima County Regional Transportation Authority 20-year plan, which is financing the work.

While Granite’s current portion of the project is a relatively modest amount, it aligns with the contractor’s updated strategy of targeting smaller, more manageable contracts that have shorter timelines, and are therefore easier to budget and estimate , than billion-dollar megaprojects.

It also fits Granite’s “home market” strategy of targeting jobs in regions where it also operates aggregate and road materials facilities. The company’s nearby Swan Plant facility will provide 36,000 tons of hot mix asphalt for the project, deliver 40,000 tons of aggregate, and collect 32,500 pounds of stormwater and sewer and shade sand .

“In addition to serving as an anchor project for the Arizona region and local workforce, the project also complements our vertically integrated business with the need for aggregates and asphalt on the project,” said Todd Hill , Granite’s vice president of regional operations. at launch.

Granite plans to start construction in April 2024 and finish in December 2026.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleWhat Boeing’s quality problems can teach construction
Next Article Michael Baker Intl. Resolves Federal Wage Bias Allegations
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.