Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Alstom wins $540 million contract for Saudi battery-powered tram
Industry News

Alstom wins $540 million contract for Saudi battery-powered tram

Machinery AsiaBy Machinery AsiaFebruary 7, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Alstom has won a $540 million contract to build what will be the world’s longest battery-powered tram in Saudi Arabia. The free catenary, 22.4 km long The project will feature 20 Citadis B battery trams manufactured by the French rolling stock manufacturer and 17 new stations.

Alstom’s contract includes the design of a comprehensive system for the tram project, as well as the integration, installation, testing and commissioning of its battery-powered system. The company will deliver power supply, signalling, communication and depot equipment, as well as complete maintenance of the tram for at least 10 years.

The contract, which is part of Saudi Arabia’s Vision 2030, was awarded in early January by the Royal Commission for Al-Ula, a government agency mandated to preserve and develop the archaeological and historical site of Al-Ula 2,000 years old. northwestern area of ​​the country.

When completed, the tramway will open access to five important historical districts, including the sites of the Old Town of Al-Ula, Dadan, Jabal Ikmah, the Nabatean skyline and the historic city of Hegra, which have been declared World Heritage Humanity by UNESCO.

The company says it will use its predictive maintenance tool introduced in 2014, HealthHub, which allows it to “monitor the health of trains, infrastructure and signaling assets using advanced data analytics to predict their remaining useful life” .

The 20 trams will be designed and manufactured at Alstom’s production centers based in France.

“This ambitious project aims to offer unique transit options for residents and tourists, with innovative and climate-friendly trams,” Alstom said in a statement. The firm is 70 years old history of infrastructure works in Saudi Arabia. Mohammed Khalil, Alstom’s managing director in Saudi Arabia, said the project “incorporates many key elements, including Saudi Arabia’s focus on environmental management.”

Alstom also supplied 69 trains and an Urbalis signaling system for Lines 3, 4, 5 and 6 of the Riyadh Metro. Vision 2030 includes the development of trams and other rail systems in the country.

Saudi Arabia’s Vision 2030 plan includes the development of trams and other rail systems to facilitate access to the country’s major tourist, cultural, agricultural and residential sites.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleThe H-1B visa final rule changes the screening process to prevent fraud
Next Article AECOM Q1 revenue, profits rise as portfolio falls
Machinery Asia
  • Website

Related Posts

Arcadis snaps up Spanish engineering firm as it weighs proposed $5.4m takeover of WSP

July 29, 2026

Age bias claims put spotlight on recent suits by AECOM, HNTB and Gehry Partners

July 28, 2026

Florida is slated to fast-track the Everglades reservoir project to completion by 2029

July 28, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

How much does it cost to rent a mini excavator? Rates 2026 – Direct minicarretes

Arcadis snaps up Spanish engineering firm as it weighs proposed $5.4m takeover of WSP

Age bias claims put spotlight on recent suits by AECOM, HNTB and Gehry Partners

Florida is slated to fast-track the Everglades reservoir project to completion by 2029

Popular Posts

How much does it cost to rent a mini excavator? Rates 2026 – Direct minicarretes

July 29, 2026

Arcadis snaps up Spanish engineering firm as it weighs proposed $5.4m takeover of WSP

July 29, 2026

Age bias claims put spotlight on recent suits by AECOM, HNTB and Gehry Partners

July 28, 2026

Florida is slated to fast-track the Everglades reservoir project to completion by 2029

July 28, 2026
Heavy Machinery

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

How a light car trailer makes towing easier

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.