Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Arizona DOT is using Sundt for a $396 million highway job
Industry News

Arizona DOT is using Sundt for a $396 million highway job

Machinery AsiaBy Machinery AsiaJanuary 15, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Award: Arizona Highway Project
Value: 396 million dollars
Location: Between Interstate 10 and Maricopa, Arizona
Customer: Arizona DOT

Sundt Construction, a general contractor based in Tempe, Arizona, was named the highest contractor for the $396 million State Route 347 improvement project in Arizona, according to an announcement from the state DOT.

The project will improve a 15-mile stretch of State Route 347 between Interstate 10 and the city of Maricopa, Arizona, according to the news release. The stretch runs through Maricopa and Pinal counties, primarily within the Gila River Indian Community.

Planned improvements include:

  • Build one lane in each direction along SR 347 from I-10 to the city of Maricopa.
  • Rehabilitation of the existing sidewalk along this same 15-mile stretch of roadway.
  • Construction of new grade-separated interchanges at Riggs Road and Mammoth Way.
  • Add turn lanes and other intersection improvements at Casa Blanca Road and Maricopa Road.

The aim of the project is to help reduce congestion and improve safety and traffic on the road.

Sundt was selected as the highest-ranking contractor after a review process by the project team, according to the release. Negotiations for the pre-construction contract are expected to be completed in February. This process, according to the press release, will allow Sundt’s construction team to add input to the design of the improvements.

The last few months have been busy for the contractor. On October 1, the company announced that Cade Rowley, its former president and chief operating officer, would assume the position of president and CEO. On the building side, the builder was selected alongside Dallas-based Jacobs for a $600 million Arizona highway project. And in November, a team of Sundt, Jacobs and HDR based in Omaha, Nebraska completed a $597 million California wastewater project.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAvoid These Mini Excavator Buying Mistakes in 2026
Next Article Corps clears next phase of modifications at Rough River Dam in Kentucky
Machinery Asia
  • Website

Related Posts

Critical Path | Engineering News-Register

March 5, 2026

U.S. Department of Labor sees repeal of Biden-era independent contractor classification

March 5, 2026

Construction views to the east | Engineering News-Register

March 5, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

What most buyers get wrong before transporting their first vehicle

Tandem axle aluminum utility trailer

Critical Path | Engineering News-Register

U.S. Department of Labor sees repeal of Biden-era independent contractor classification

Popular Posts

What most buyers get wrong before transporting their first vehicle

March 5, 2026

Tandem axle aluminum utility trailer

March 5, 2026

Critical Path | Engineering News-Register

March 5, 2026

U.S. Department of Labor sees repeal of Biden-era independent contractor classification

March 5, 2026
Heavy Machinery

What most buyers get wrong before transporting their first vehicle

March 5, 2026

Tandem axle aluminum utility trailer

March 5, 2026

Average width of a car trailer

March 4, 2026

Buying guide for open aluminum trailers for long-distance vehicle transport

March 3, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.