Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Award of Merit, Water/Environment: Hyperion Advanced Water Purification Facility
Industry News

Award of Merit, Water/Environment: Hyperion Advanced Water Purification Facility

Machinery AsiaBy Machinery AsiaOctober 28, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Advanced Hyperion water purification facility


Del Rey, California


Merit Award


Presented by Walsh Group


owner Sanitation and Environment of Los Angeles


Leading design company Brown and Caldwell


General Contractor Walsh Construction Co.




As part of a proof-of-concept toward the City of Los Angeles’ ambitious goal of recycling 100 percent of its wastewater, this large-scale, 1.5-million-gallon-per-day facility is now one of the largest water reclamation plants in the country.

To help create a new, sustainable water supply for Los Angeles and fully reuse all water at Hyperion, the plant treats primary effluent to provide high-quality nitrified-denitrified recycled water for various uses at Los Angeles International Airport, including cooling tower make-up water, toilet flushing and other non-potable uses.

Multiple advanced treatment processes are used at Hyperion, including membrane bioreactors, reverse osmosis and advanced ultraviolet oxidation.

As Los Angeles Sanitation & Environment’s first progressive design-build project, collaborative delivery allowed the team to address many project complexities, including multiple layers of stakeholder interests, regulations for non-potable reuse, a tight schedule, and the owner’s desire to be heavily involved during the design, preconstruction, construction, and performance validation phases.

Shortly after the project started, the project team learned that they had 30% less space than planned. To accommodate the treatment process, the new configuration places equipment and provides access to three structurally configured elevated decks, while placing fine screens directly above the BNR basins, saving space and reducing tributary pumping infrastructure.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleMassive Case Excavator Gets New Thumb But It Cost Us! Rookie Operator
Next Article The Ultimate How-To: Operating the Typhon TERROR XI Mini Excavator
Machinery Asia
  • Website

Related Posts

Midwest On the Scene: Redevelopment around Chicago’s United Center Sports Arena

June 30, 2026

Data centers and housing drive growth in Des Moines

June 30, 2026

Midwest People: July 2026 | Engineering News-Register

June 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Midwest On the Scene: Redevelopment around Chicago’s United Center Sports Arena

Data centers and housing drive growth in Des Moines

Midwest People: July 2026 | Engineering News-Register

Venezuela digs out of massive earthquake

Popular Posts

Midwest On the Scene: Redevelopment around Chicago’s United Center Sports Arena

June 30, 2026

Data centers and housing drive growth in Des Moines

June 30, 2026

Midwest People: July 2026 | Engineering News-Register

June 30, 2026

Venezuela digs out of massive earthquake

June 30, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.