Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home » Balfour Beatty Mobilizes for Miami Beach Hotel 1m-FT-FT
Industry News

Balfour Beatty Mobilizes for Miami Beach Hotel 1m-FT-FT

Machinery AsiaBy Machinery AsiaApril 29, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Balfour Beatty is preparing to begin construction at the Grand Hyatt Miami Beach Hotel, a development of 996,130 square meters that will serve as the central anchor of the city’s Convention Center District. Approved by voters in 2018, the project will serve as the first Grand Convention Hotel of Miami Beach next to and connected with the recently reformed Miami Beach Convention Center.

The construction service contract, valued at $ 385 million, calls for Balfour Beatty to deliver a 17 -story hotel of 800 rooms designed for a joint company by local developers Terra Group and Turnberry, Balfour Beatty announced on April 29. Designed by Bernardo Fort-Bescia, by Lead Architectonica Architect, the project will include four floors from the interior/exterior of the meeting room and the meeting room with 100,000 SQ FT, more than 50 Samares with more than 50 suites with more than 50 hours with more than 50 Samares with more than 50 Samares with 50,000 SQ FT, with more than 50 SQ FT, with more than 50 sq ft. Views of the city, a tourist -style pool cover, sales areas on the ground floor and a pedestrian skybridge controlled by climate that connects the complex with the Convention Center. Parking will also be provided for more than 300 vehicles.

Balfour Beatty was selected for the project by 2023 and completed the place preparation work. Dollar $ 392 million Loan of developers for the project follows a grant of $ 75 million granted through the Miami Beach Redevolution Agency at the end of 2024, highlighting the role of the project as an economic driver for the region. Although no global cost of the project has been announced, estimates amounted to $ 600 million, according to reports. Construction is scheduled for completion by the end of 2027.

According to the Convention Center, the development also plans to introduce new public spaces, pedestrian walks, bicycle sharing stations and connectivity with public transport, aligning with the wider goals of sustainability and resilience of Miami Beach, while providing access to other attractions such as the new world center, the Art Museum and Miami Beach Botanical Garden.

The start of the Miami Beach Grand Hyatt project comes when Balfour Beatty approaches the Broward’s 1.2 million $ 1.2 million conventions and the hotel’s expansion in Fort Lauderdale. In addition to adding more than 525,000 square meters of meetings and events, the project includes a new omni hotel of 29 floors, 800 bedrooms and a central energy plant of 36,000 square meters.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleIBM is committed to $ 150 million in the manufacture of US manufacture, research
Next Article Land Compensation Teams | Skid Ster attachments and excavator
Machinery Asia
  • Website

Related Posts

Merit Award, Specialized Construction: GeoBarrier System at the Furama Riverfront Hotel

December 14, 2025

Best Project, Government Building: New Consulate General of the United States in Merida | The project team overcomes the unexpected

December 14, 2025

Best Project, Sports/Show: Santiago Bernabéu Stadium

December 14, 2025
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Merit Award, Specialized Construction: GeoBarrier System at the Furama Riverfront Hotel

Best Project, Government Building: New Consulate General of the United States in Merida | The project team overcomes the unexpected

Best Project, Sports/Show: Santiago Bernabéu Stadium

Merit Award, Power/Industrial: Combined Cycle Implementation at the Santa Cruz Thermoelectric Power Plant

Popular Posts

Merit Award, Specialized Construction: GeoBarrier System at the Furama Riverfront Hotel

December 14, 2025

Best Project, Government Building: New Consulate General of the United States in Merida | The project team overcomes the unexpected

December 14, 2025

Best Project, Sports/Show: Santiago Bernabéu Stadium

December 14, 2025

Merit Award, Power/Industrial: Combined Cycle Implementation at the Santa Cruz Thermoelectric Power Plant

December 13, 2025
Heavy Machinery

Aluminum car trailer

December 2, 2025

Wheel Dozer vs. Crawler Dozer

November 20, 2025

Where can I find reliable mini excavator dealers near me?

October 27, 2025

The complete expert guide to faster and smarter cargo transportation

October 27, 2025

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.