Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home ยป Best Project, Specialty Construction: University of Maryland Shock Trauma Center Renovation
Industry News

Best Project, Specialty Construction: University of Maryland Shock Trauma Center Renovation

Machinery AsiaBy Machinery AsiaOctober 12, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Renovation of the University of Maryland Shock Trauma Center

Baltimore

BEST PROJECT

Sent by: Turner-Mahogany, joint venture

Owner: University of Maryland Medical Center

Main design company: CRGA

General contractor: Turner-Mahogany, joint venture

Structural Engineer: Morabito Consultants

MEP Engineer: WSP


The $12.4 million building systems overhaul is the initial phase of the medical center’s plan to convert three existing office and administration floors into patient space for the shock trauma unit. Accomplished alongside critical patient care spaces and an active heliport, the three-year, seven-phase renovation required creative team-wide planning and coordination techniques to maintain hospital services 24 hours a day hours of the day and ensure the safety of patients and staff. The project included the phase-out and replacement of two indoor air handling units (AHUs) and the complete construction of new power, hydronic and fire protection systems. Minimizing service disruptions was a priority, with the most complicated parts of the schedule subdivided into up to 16 separate phases to limit downtime and disruption.

During a pre-planned 24-hour window, sections of the ATUs were lifted by crane into the mechanical room on the upper floor through a temporary hole cut in the exterior of the building. The operation was interrupted six times to accommodate the arrival of emergency response helicopters.

Renovation of the University of Maryland Shock Trauma Center

Photo courtesy of Turner Construction Co.

To accommodate new main and emergency power equipment, the existing elevators and a staircase were demolished and reused as MEP shafts for new and future service. Exterior grills and metal panels were added to the existing brick facade.

The three-dimensional design of the project and the coordination technology helped to plan the upgrade, especially in the active and congested mechanical room. A complex network of fall protection measures allowed workers to move safely between levels. The standard for executing the design was extremely high, as even a half-inch deviation from the location of a hanger could have a ripple effect that would seriously hamper the project. The business partners who executed the work understood the importance of precision and pre-fabricated as much as possible to match the design.

The project team also implemented measures to meet noise limitations, established fire watch protocols and carefully coordinated scheduled outages. Efficient coordination with the loading dock kept critical deliveries on schedule throughout the project.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAward of Merit, Sports/Entertainment: Longwood University, Joan Perry Brock Center and Tennis Courts
Next Article Contract analytics startup Document Crunch raises $21.5 million in Series B round
Machinery Asia
  • Website

Related Posts

Critical Path | Engineering News-Register

January 30, 2026

Augmenta AI helps organize electrical work in schoolwork

January 29, 2026

In the Great Lakes area, a vehicle operated by divers installs new tunnel linings without the need for dewatering

January 29, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Critical Path | Engineering News-Register

Augmenta AI helps organize electrical work in schoolwork

In the Great Lakes area, a vehicle operated by divers installs new tunnel linings without the need for dewatering

Help preserve what makes America’s buildings safe

Popular Posts

Critical Path | Engineering News-Register

January 30, 2026

Augmenta AI helps organize electrical work in schoolwork

January 29, 2026

In the Great Lakes area, a vehicle operated by divers installs new tunnel linings without the need for dewatering

January 29, 2026

Help preserve what makes America’s buildings safe

January 29, 2026
Heavy Machinery

Car hauler trailer kit basics for real world towing

January 26, 2026

Hydraulic tilting gooseneck trailer for transporting heavy equipment

January 26, 2026

Aluminum car trailer with tilt bed explained for real world vehicle transport

January 26, 2026

What is the best cover for a car trailer?

January 23, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.