Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Critical Path | Engineering News-Register
Industry News

Critical Path | Engineering News-Register

Machinery AsiaBy Machinery AsiaJanuary 30, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Best of the best finalist projects

Photos courtesy (left to right): Hoffman Construction; Superior Construction; Kiewit

Finalists include Fab 52, the Hurricane Ian Sanibel Access Project and the Klamath River Renewal Project

After a year-long effort that began with more than 800 entries, industry judges and ENR editors have selected a trio of complex and critical projects as finalists for Project of the Year in ENR’s 2025 Best of the Best competition.

At the beginning of this month, the 20 winners of the category were announcedselected by several rounds of judging. Panels of industry experts reviewed hundreds of national entries submitted by project teams and assessed them based on their impact on the community, improving construction industry practice, innovation in design, safety and quality of work.

Based on a list submitted by the judges, ENR editors examined each project, considered additional sources for new details, and selected the following three projects as finalists for the “Best in Show” award:

In alphabetical order, they are:

Fab 52 (Eagle Project)based in Chandler, Arizona. Originally posted by Hoffman Construction on ENR Mountain States & Southwest in the Manufacturing category

Hurricane Ian Sanibel Access Projectlocated in Sanibel, Florida. Originally posted by Superior-de Moya Joint Venture Team at ENR Texas & Southeast in the Highway/Bridge category

Klamath River Renewal Projectlocated in Hornbrook, Calif. Originally Posted by Kiewit Infrastructure West Co. at ENR West in the Water/Environment category

The finalists, as well as all category and judges’ recognition winning projects, will be featured in more depth in the March 16 print issue of ENR, which will also reveal the Project of the Year.

ENR will recognize these projects and their teams at a brunch at Pier Sixty, Chelsea Piers in New York City on March 26, as well as at the magazine’s 61st.th Annual Excellence Award Gala that will also highlight the magazine’s top 25 news producers and the Excellence Award winner.

Make plans to attend by visiting https://www.enr.com/aoe.

In the spring, ENR will launch its call for the Regional US Best Projects 2026 competition. For more information, visit last year’s entry page at www.enr.com/bestprojects.

Registration dates and eligibility will be updated once the call begins.

Scott Blair

Blair leads the day-to-day operations of ENR’s editorial team to ensure brand quality and best practices. It spearheads the various ENR competitions, such as Best Projects and the Excellence Award, and organizes editorial content at events such as the Top Young Professionals conference. Jesse H. Neal, Construction Media Alliance and AZBEES award-winning writer and videographer, Blair is a frequent contributor to ENR’s growing video channel with project tour videos and interviews with industry leaders. He is also a frequent speaker and moderator on topics such as diversity and inclusion, workplace design and technology, construction media and methods, and marketing.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAugmenta AI helps organize electrical work in schoolwork
Next Article Corning, Meta ink $6 million deal that supports US manufacturing
Machinery Asia
  • Website

Related Posts

Richard S. Weeks, 73, sets a standard for lifts and growth in marine construction

October 13, 2026

An earthquake shakes southern Panama, damaging bridges and destroying homes

October 12, 2026

Transit leaders are looking for local support to strengthen the programs

October 12, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

The man steals a backhoe, goes for a walk | Newsradio 600 KOGO

Richard S. Weeks, 73, sets a standard for lifts and growth in marine construction

An earthquake shakes southern Panama, damaging bridges and destroying homes

Transit leaders are looking for local support to strengthen the programs

Popular Posts

The man steals a backhoe, goes for a walk | Newsradio 600 KOGO

October 13, 2026

Richard S. Weeks, 73, sets a standard for lifts and growth in marine construction

October 13, 2026

An earthquake shakes southern Panama, damaging bridges and destroying homes

October 12, 2026

Transit leaders are looking for local support to strengthen the programs

October 12, 2026
Heavy Machinery

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

2 Place Car Trailer: How To Choose The Right Two Car Transporter For Vehicle Transport?

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.