Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Sustainability Excellence: San Mateo County, County Office 3 (COB3)
Industry News

Sustainability Excellence: San Mateo County, County Office 3 (COB3)

Machinery AsiaBy Machinery AsiaMarch 14, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

County of San Mateo, County Office building 3 (COB3)

Redwood City, California

Excellence in sustainability

Region: Hell California


Sent by: Construction of Trubeck

Owner: San Mateo County

Lead design company and structural engineer: Skidmore, Owings & Merrill (Som)

General contractor: Construction of Trubeck

Civil Engineer: Inc.

Subcontractors: Mechanical Critchfield; JW MCCLENAHAN; CSI electrical contractors; Cosco fire protection; Architectural and aluminum glass; Western wood structures





The sustainability was more in the head for the county officials and their project team working in this $ 195 million massive wood office building. The five-story building with 208,000 square meters is the first Massive Mass Wooden Civic building, designed by Net-Zero Platinum built in the United States, has a massive wood and a glulam frame with a cross-lined wooden roof structure, which helped achieve a reduction of 85% in carbon embodied in comparison with a conventional structure.

“San Mateo County aimed to create a daring civic building with strong sustainability goals,” said Mark While, Trubeck Construction Executive Project in a statement.

County of San Mateo, County Office building 3 (COB3)

Reid Schultz/Truebeck Construction photo

Trubeck sought companies that could install the massive wooden package and blocked at three -phase material prices. This saved more than $ 1 million on material costs. The design allowed additional savings by using CLT of five layers instead of seven layers, complementing Douglas Fir on the upper and lower layers exposed with low cost wood for the center.

County of San Mateo, County Office building 3 (COB3)

Rowan Jack photo

The whole electric building has 333 kW of solar matrices in situ. MEP systems were designed for efficiency and have a redundancy providing greater resilience and future flexibility. The building has 190 automated operating windows that provide natural ventilation and passive cooling every night when the outer conditions are soft.

County of San Mateo, County Office building 3 (COB3)

The massive wooden building has a high performance envelope, solar design strategies and passive in place.
Rowan Jack photo

To minimize heat gain and reduce the need for artificial cooling while optimizing the day’s light, the outer glass of the north facades is embroidered and shaded, while the glass on the east and west facades is protected by the fins. The site also has bioretence planters that absorb and treat the entire rainwater runoff of the site. Compared to other buildings of this size, COB3 uses about 610 MW less power and 250,000 less gallons of water a year. “This is not only the greenest civic building in the United States, but one of the most aesthetically pleasant,” said David Canepa, President of the San Mateo County County Supervisors in a statement.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleStrengthen subcontracting relationships by management of the IA -fed IOC
Next Article Best K-12 Education: Bard High School Early College
Machinery Asia
  • Website

Related Posts

From the Archives: April 16, 1959

March 24, 2026

Interior deploys $889 million for western water systems as capacity losses mount

March 24, 2026

A bold new vision for construction safety

March 24, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

From the Archives: April 16, 1959

Interior deploys $889 million for western water systems as capacity losses mount

A bold new vision for construction safety

How the plans for Safety Week 2026 came together

Popular Posts

From the Archives: April 16, 1959

March 24, 2026

Interior deploys $889 million for western water systems as capacity losses mount

March 24, 2026

A bold new vision for construction safety

March 24, 2026

How the plans for Safety Week 2026 came together

March 24, 2026
Heavy Machinery

Car trailer with hydraulic drop cover makes loading faster and safer

March 23, 2026

Car trailer turn box guide for safe and efficient towing

March 20, 2026

How much weight can a flatbed car transporter trailer carry?

March 16, 2026

How to choose the right aluminum deck trailer for heavy vehicles

March 16, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.